Laserfiche WebLink
i <br /> I <br /> February 1999 <br /> Page 7. <br /> There are four additional reports that need to come in which will be called <br /> • <br /> four project notes. In order to keep going, some things have to be subject to a <br /> final review but he did not feel there is any problem with this. it is explicit <br /> that until a letter is sent that everything 1s all set, It doesn't start. <br /> Kathy Kiley stated she is very comfortable with it. <br /> Steve Hurley has fleshed out thresholds upon which pumping could be <br /> stopped if there is a threat to aquatic fauna or trout. If AFCEE AFCwants to <br /> change the language, they would have to have Steve Hurley's and Dr. Ross' <br /> okay. A schedule ofwork and project notes should be provided. Language <br /> was added from the Emergency Certificate that they will be responsible for <br /> any spills. <br /> S <br /> Mr. Sherman advised Kathy Filey gave him some DEP Boiler Plate for rare <br /> species, mainly about the spotted turtle., <br /> The new bog area to be created has been held in abeyance. Natural Heritage <br /> has advised they do not consider that a problem as their letter initially <br /> stated. No later than April 1, 2000 an application roust be made for an <br /> Amended order for creation of the new bog area. If the work is to beyond <br /> three years an extension permit will have to be obtained. <br /> Since there is erosion potential in many areas, there will have to be a brief <br /> report every two weeks and following any 2" rain storm within a 24 hour <br /> period. <br /> Where is a one year test, so he added language in #27 that anything beyond <br /> the one year pilot test has to be the subject of an Amended Order o <br /> Conditions. The expanded bog arca could be wrapped into that also. <br /> Ms Balkus. had a question on the spotted turtle. Ikon Schall advised he spoke <br /> with Hanni Dinkerloo. She believed it was not necessary for him to have a <br /> permit as long as he followed the practices and procedures he follows now as <br /> a subcontractor to Jacobs Engineering. <br /> Mr. Sherman asked Ms Kiley if that was copasetic` It was. Mr. Sherman <br /> stated that would be omitted when the others are incorporated. <br /> Mr. Fitzsimmons commended the Agent for putting this forth in such a short <br /> period of time and stated he was very impressed with the cooperation <br />