Laserfiche WebLink
22 April 1999 <br /> Page 14. <br /> plantings up along the deck. It would provide a corridor that does. not noir <br /> exist. <br /> Mr. Rosenberg asked if they were talking about cutting the walkway back to <br /> ' and-bringing the foliage, or planting, right up to the edge of the deck? <br /> Mr. Green stated right up to the walkway. Mr. Sherman stated they would <br /> need room for access for maintenance but could get within 2' of it. Mr. Green <br /> disagreed and stated there is no reason not to. <br /> Mr. DiGregorio stated given the additional 14' x 1 .......,1Ir. Green <br /> suggested to run a straight line and bring it back to 12' to not get closer to <br /> the pond. If he wants 14' he can go back the other way. Mr. DiGregorio <br /> agreed to wide by that. <br /> Mr. Fitzsimmons stated it is a total of 316 s.f, and there will be 316 s.f. of <br /> planting. <br /> Publiccomment: None. <br /> Mr. DiGregorio will provide a revised plan. It will be a ' x 32' boardwalk to <br /> 14' x14' deck, a straight lime across with the boardwalk, and an equal area <br /> of mitigation. <br /> VOTE: Motion made and seconded to reschedule and readvertise the hearing <br /> to 6 May 1999 at 7:15 p.m. <br /> CONTINUED To 6 MAY1999 AT 7:15 P.M. <br /> Quashnet Bogs: Mr. Sherman advised an invitation was received from the <br /> Falmouth Conservation Commission to a meeting on 1 May concerning long <br /> range plans for the bogs. He will not be male to attend and asked if anyone <br /> else could. <br /> The Chair suggested copies of the minutes be requested. <br /> Mr. Sherman advised that because of berm construction on K5, some ditches <br /> have been cut off. Tom s ymoniak asked if they could create a sump pump <br /> and pump from K6 to K5 which is scheduled to be abandoned. There is a <br /> haybale dike built around the point of discharge that is operating now. <br />