Laserfiche WebLink
Determination,- which Motion was seconded by Carol Moore and so <br /> voted unanimously. <br /> . <br /> 6 . Request for Monitoring wells near Quashnet Bogs-Mr. <br /> Sherman reported a request for two ) additional monitoring <br /> wells at the Quashnet Bogs has been made. The proposed location <br /> would be near the old, abandoned bog, one being approximately 60- <br /> 70 feet array, the other being a closer. one location is on the <br /> southwest side of the abandoned road. In order to accomplish <br /> what is being proposed, several trees will have to be removed. <br /> Mr. Sherman has determined that every tree over six inches being <br /> removed will be replaced by three 3 shrubs. Filings for <br /> monitoring wells are not required under~ the State Act . <br /> The Chairman entertained a motion. <br /> MTI1T: John Johansen made a Notion to authorize the <br /> Conservation Agent to make and carry forward the decision to <br /> approve placement of additional monitoring wells with the <br /> condition that every tree over six inches being removed will be <br /> replaced by the planting of three shrubs; which Motion was <br /> seconded by Ralph Shaw and so voted unanimously. <br /> 7 :20 Dario D. Sabatini, 147 Summersea Road, continued from <br /> March 2nd., Notice of Intent. <br /> The Chairman recognized David Sank i, cape & Islands <br /> Engineering, who stated the original proposal called for a <br /> vertical vinyl bullhead. Upon determination this would not be <br /> appropriate for the adjacent salt marsh area, the plan has been <br /> revised. <br /> With reference to attempts to protect vegetation from <br /> further erosion on the northern side, mr. Sanicki proposed the <br /> use of gabions, filter fabric and hand excavation in order to <br /> avoid heaver equipment on-site. Mr. Sanicki was making <br /> references to the plan. <br /> 1r. Sanicli also stated there is to be an on-site Meeting <br /> prior to installation with the contractor and the Conservation <br /> Agent present. <br /> Mr. Sherman recommended approval of the proposal with the <br /> added condition that the exact revegetation be subject to an on- <br /> site meeting and agreement with the contractor) ; to which Mr. <br /> sani c} i agreed. <br /> The chairman inquired as to the status of the salt marsh <br /> line. <br /> Mr. Sherman agreed the lime needs to be more clearly <br /> defined. The work being proposed will take place above the line, <br /> and will be completely staled-out prior to the installation of <br /> said gabions. -5- <br />