My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/24/2001 CONSERVATION COMMISSION Minutes
>
1/24/2001 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2018 5:02:29 PM
Creation date
2/28/2018 2:04:46 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
01/24/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
it <br /> are to be constructed. A golf cart bridge is to be constructed <br /> across the water in this area, described as a 401 x 10 , wooden <br /> bridge (either pre-constructed or constructed on-site) . <br /> Mr. Sherman requested a large scale view plans of said bridge <br /> detailing its installation, for Commission review in order to <br /> determine alteration impacts . <br /> Attorney M I lh.inney made reference to the fly-over hole, <br /> across the mouth of Quaker Run, which i be revised in order~ <br /> to protect the banks and vegetation i that area. The hole is now <br /> going to be constructed on the western side of Quaker Run, <br /> resulting in a slight increase in wetland impacts. <br /> willowbend Golf Modification ication - Proposed Golf Course Layout <br /> on Table - Ms. Ball mentioned vista pruning around the 25th <br /> green. - <br /> 1r. Sherman asked if there are any additional areas Located <br /> within the buffer zone to be considered. Ms. Ball indicated <br /> those areas. <br /> . Sherman asked for further clarification with reference <br /> o clean-up o the intermittent stream to <br />� gated at the southern <br /> end. He noted the State has declared a state of draught, making <br /> determinations of .intermittent/perpetual flow extremely <br /> difficult. <br /> Ms. Ball made the point that the Town By-law determines <br /> r iverf cont begins at the BVW. <br /> MitigationAreas : There are a number of areas currently <br /> within managed turf areas located within buffer- zone or <br /> riverfront area that are to be reveget aced with native plantings. <br /> borne _SI te revegetation within riverfront area i also <br /> being proposed. (Not a part of the r oed7 o 'ect however it <br /> is Wi l l owbe .d property. ) , <br /> Conservation restriction within the buffer zone has been <br /> established through Cape Cod Commission along rant ' s Cove and <br /> along Shoestring Bay to be set aside as "Permanent p'rotection. " <br /> Ms. Hall indicated location of the Stewardship Program <br /> mentioned earlier, which will provide educational opportunities <br /> for High School students. <br /> Removal of impervious surface and areas of phragmites <br /> currently located within Shoestring Bay. There was brief <br /> discussion regarding the proposed method of removal; and the <br /> P . r <br /> possibilit of including monitoring into the Steward hip <br /> rograx <br /> -6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.