Laserfiche WebLink
Motion rade, seconded and unanimously carried to grant a continuance to August <br /> 21 st at :00 p_m., at the request of the applicant. <br /> :1 .m,, Dennis Williams,, 1 Triton Way (continued from 7117/03 . Brad Holmes <br /> represented the applicant. Bob said the plan now shows vista vier corridors which <br /> meet our standards as well as a notation of the landscape plan. Jack asked ghat was <br /> between the two corridors. Mr. Holmes said an area which was vista pruned in the <br /> past. Elliot asked if the total of the two corridors and the area between constituted <br /> more than the 25% allowed. Mr. Holmes said the two corridors combined totaled 25%, <br /> so the area in between has not been included in the calculation. Michael said in the <br /> past we've been known to not allow any vista pruning corridors in areas where there <br /> are already substantial vistas. 11r. Holmes said this property had a previous vista <br /> pruning order of Conditions and the owner just wants to ma intain it. <br /> Jack said in the past any path down to the beach has been included in the 25% <br /> allowance, and this area for the path has already been pruned. He said the intent of <br /> the regulations was to preserve 5 of the shoreline. <br /> J <br /> Michael el said we generally require pathways to either be within the vista pruning <br /> corridor or included In the 25% calculation, because it constitutes a corridor as well. <br /> He said we have to consider the effects of setting a precedent. 1f vire allow vista <br /> pruning on the only canopy trees in the entire 100 ft. buffer zone, we set a precedent <br /> which we have not allowed other people to do. <br /> Lotion made, seconded and unanimously carried to approve the plan subject to <br /> Michael visiting the site with Bob to determine the order of condition regarding the <br /> width of the corridors. <br /> 7:20 .r ., Cosmos Chrasis, 146 Captain's Rover (replace a tool shed). Bob <br /> recommended approval. Jack asked if the all the fees have been paid. Bob will ask <br /> Pauline to check this. <br /> Motion made, seconded and unanimously carried to approve the plan subject to <br /> Pauline checking if the fees have been paid. <br /> 7:25 .m., Malcolm Portnoy, 65 sunset circle (construct addition and extend deck). <br /> Dere snicki requested a continuance for the applicant. He explained that a section of <br /> Sunset circle backs into a channel that connects to John's Pond, and the applicant has <br /> cut from the house to the water's edge of that channel. The BVW needs to be <br /> ascertained. A continuance is requested so we can give one month to notify these <br /> parties to not cut the grass within 10 ft. of the wall and see if something grows. <br /> Bob said because they are going to be within the 50 ft. buffer, there VAII have to be a <br /> flexibility clause based on numerical criteria which can't be deciphered until we know <br /> where the B W is. <br />