Laserfiche WebLink
i <br /> 7:03 Devin Mulgrew **43-2687** (33 Sunset Circle) Construct wood retaining wall, fieldstone <br /> retaining wall and replace turf& patio area with sand and compensatory plantings- NO] <br /> C n tinued to Alarch 8, 2012 @ .•03pm <br /> Resource Area: #Buffer Zone to Johns Pondl Inland Bark <br /> Material teria s m ed: <br /> 13:5 5 M r. M u I g rew req nested a co nti n u a n ce to M a r h 8, 2012. <br /> Motion made, seconded and unanimously carried to continue t6 March 8, 2012 at 7:030m <br /> i <br /> : 'Brian Casey Mutiny lay Upgrade septic to Title V. Existing system shall be pumped, <br /> filled with clean material and abandoned or removed and disposed of at ar suitable landfill <br /> RDA <br /> Resource Area: Buffer Zone to Inland Ba kl BVW <br /> Material submitted: Site Plan 1117112 J.E .an ers-Cawley Profile of Sewage System 7112 <br /> JE Landers-Cawley <br /> -10][14. <br /> Barbara Fra p pier from Warwick &Associates is standing in for Jack Landers-Cau ley and <br /> explains that they are proposing a septic system upgrade to a new Title v system. It will consist of <br /> a denitrification system because of the proximity to the wetland resource area. Agent McManus <br /> asks if the retaining wall will be rebuilt in the same footprint and sane material. Nis Frappier <br /> responds that it will.be rebuilt in kind. The Agent starter that when the wall is being reconstructed, <br /> the permit will be conditioned to require siltation for erosion control. Agent McManus reads the <br /> Board of Health comments for the record. <br /> Motion made, seconded and unanimously carried for a Negative Determination <br /> 7:09 Brian Casey (12 sagarn re Road) Upgrade septic to Title V. Existing system shall be <br /> pumped, filled with clean material and abandoned or removed and disposed of at a suitable <br /> landfill - RDA <br /> Resource Area; Isolated Land Subject to Floo.ding <br /> Material submitted: Site Plan 211112 �E Landers-Ca uley Profile of Sewage System 21111,E �B� <br /> antlers-Cau ey <br /> 19; 9 Barbara Frappier is also representing this project which is also a proposal for a septic <br /> system upgrade to a new Title V. This system will be installed with a denitrification system as it i <br /> within 100 ft to a certified vernal pool. M .'Frappier explains that there is an existing stone wall that <br /> will not be replaced. Agent McManus will,condition this permit requesting a methodology for access <br /> and siltation control. The Agent reads the Board of Health comments for the record. Mr. Cook asks <br /> where the existing tank is currently and Ms. Frappier explains that she is unsure because she did <br /> not do the drawing. Agent McManus explains that standard procedure is to pump and fill but if <br /> there is any equipment that needs to access the back then he will need to know the details. <br /> Motion made, seconded and unanimously carried for a Negative Determination <br /> :12 Susan Biel ff(1 21 Ninigret Avenue) Instarll three helical piles on the east corner of the home <br /> - RDA <br /> Resource Area, Buffer to inland Bank Leading to Cataquin Pondl Buffer to BTI <br /> Material submitted: Proposed ose Septic System Upgrade (hand drawn) 219112 Owner <br /> 2 <br />