Laserfiche WebLink
TOWN OF SEE, BOARD OF HEALTH, MEETING9 MAY 11, .1987 Page two <br /> f <br /> THAT HAPPY WITH THE IDEA OF PUTTING ANOTHER WELL IN BECUASE THERE IS THE POSSIBILITY OF THE DRAW OF <br /> THAT NEW WELL IT MAY PULL THAT PLUME INTO ANOTHER DIRECTION AND WE'D LIKE IT TO STABILIZE SO WE CAN <br /> FIND WHERE IT IS. SO THAT WITH THE ADVICE OF TOM COUNSEL WE-FEEL THAT OUR RESPONSE TO THESE PEO- <br /> PLE WILL BE THAT IF WE USE A FILTERING PROCESS, THEY HAVE THE MAINTENANCE PEOPLE UP THERE THAT CAN <br /> TAKE E CARE OF I T, WE CAN NAME A CONTRACT SIGNED FOR THE COMPANY TO ADVISE IN THE MAINTENANCE ADVO THE <br /> WHAT-NOT, AND IN THE INTERIM -IAT THEY HAVE DONE IS TO BY-PASS THAT WELL AND THEY ARE CURRENTLY <br /> TL <br /> USING'OVER THE GROUND SES I N .ORDER TO BRI 1G. WATER INTO THAT BU I LD I NC #14. <br /> (Note: The foregoing was a verbatim by W. Buckingham) <br /> CRC: You suggest that they hook the wells back up with a filter. would the filtering system that <br /> is being proposed rewve e eryth i ng <br /> W. Buck i ngh ani stated that the f i 1 ters that are be i ng proposed by W. Jones had been used on Long <br /> Island and have partial agreenent, they were used for the Aldecarb problem. The filtering has par- <br /> tial <br /> ar- <br /> tia1 approval from EPA & DE E, this same filter will remove the volatiles that removed the Aldecarb- <br /> the f i Iters are capab le of a through put of 75M ga I Ions, wh i ch s hou I d be ade uate. The prob l erg i n <br /> Long Island was that they put an outlet before the back wash and people were throwing wager out in <br /> the ,yards which hadn't gore through the filtering. CPB and Jones will get in touch with DEE. The <br /> money for the project will be found somhow by the Selectmen. <br /> George Costa asked whether hook i nig into the water main at the Rotary wou 1 d be a solution. <br /> C FB said that would be the short terra/1 ong tern solution, roe had been requested at town meting <br /> for en g i neer i ng but not actualCxortzract work and W. B be 1 ieves that DEE thought their i nterpreta- <br /> t i on of this was 'foot dragg i ng r Talks are continuing with H i ghwood and the urderstand i ng is that <br /> e vii 1 I not take-more than a ,years I supply of water from them and that ownt of water wi 11 be re- <br /> paid <br /> e- <br /> pa.id to the -H i ghwwood water system upon our getting a we l 1 source. A possibility is the T-4 well in <br /> the Quinaquisset area, however at this time DEE wants to hold off on that until to tiM and a <br /> mathemati c l model than 900,000 gallons per day will not i of l uence the p l uTe <br /> CPB also e l abo rated on the fact that H i ghwood still has not have on 1 i n the reservoir tank that <br /> they were supposed to have had by this Spring and to the fact that this Board has questioned th i s <br /> fact with DEE and has not gotten a reply as yet. There is a well field in ockway Bay that was <br /> tested from three to five years ago with a yield of 1 million g.p.d, however, it has a high back- <br /> ground of manganese, but if push corns to shave we probably could get sore grunt money to build a <br /> cleansing plant. <br /> 6. The meeting with the owners at a mer good those in attendance are: O'Donnell, Kevin Huff, <br /> Leahy, Helen/Harry Gxdnan <br /> W. Buckingham introduced the board mw ber , explained that they were invited to attend th i s <br /> meeting after having rece i gyred letters from this office advising thea of the closing,down of the <br /> well for Building 14, 'porgy advise' frm DEE and- EPA in answer to Board request a ~to the useage <br /> of water; at Slur ad taking into consideration the concentratioin of volatiles in the water). <br /> Discussion was held on alleviation ofthe problem on a 'short tern' (two weeks to a month) this <br /> has been the responsibility of the interim water commissioners, wbo, had been looking into water <br /> from H i hwood or the T-4 site., those plans are still going forward. <br /> After discussion with Weston/meson, DE E, EPA and W. Jones the choices opted were: 1 <br /> do nothing, 2 prov i de .water• from an outs i de-source and S a f i l ter i n process 4 do it a <br /> quickly as passible. It was thought that a new well could be installed west of the buildings at <br /> Mme mod (in-formation from Weston/Sampson had shown this area to be outside the pluTe emina- <br /> t i ons) however, the draw on that well might cause a shift in the direction of the p l ume, the <br /> study to determine the location, shape and direction of the plume is ongoing, Phase I I, wells <br /> were drilled last week of rrulti level types. <br /> The filter to be used would be capable of filtering 75 1 gallons and the well for Bldg 14 <br /> would be continued to be used. Discussions will be held with DEE and EPA to be sure that the <br /> filters will be of the right size and type, as soon as permission is granted by thea, the filters <br /> lters <br /> will be gotten and installed; mai rpt en ante will have to be provided and the company frcm which <br /> they are gotten.will have to be consulted regard i n the maintenance and the rte,i ntenance person at- <br /> SUMProod will have to be considered to be sure that filters are changed when required. <br />