Laserfiche WebLink
r# <br /> MINUTES June 7 . 1390 2 BOARD OF HEALTH <br /> Mr. costa stated this repair is conditional upon no in- <br /> crease in habitable space, Board members were in agreeance. <br /> . ) Water test results Great River Road Ivester <br /> Mr. McQuaid stated this Board certified the system in failure <br /> one year ago. Due to the close proximity of the water Mr. <br /> Sylvester was required to submit engineering plans. The well <br /> was relocated, however results indicated high sodium, Re- <br /> vised plans were submitted delineating a new well location <br /> which maintains the furthest distance possible from the wa- <br /> ter. Well samples were taken, again analysis indicated high <br /> sodium. In speaking with Mr, George Heufelder sodium levels <br /> were 117 ppm, recommended levels are 20 ppm. Mr, Heuf e l der• <br /> relayed the sodium level on this lot is not significant, he <br /> recommended this Board allow the use of the well, as long as, <br /> tenants are made aware of the high sodium levels. <br /> Mr. costa stated the owner should be required to supply <br /> bottled water to tenants. <br /> Mr, Greelish requested Mr. McQuaid to inform Mr. <br /> Sylvester to submit a plan to this Board ensuring bottled wa- <br /> ter will be supplied to the dwelling. <br /> APPOINTMENT: Ron Honvi - Southport update <br /> Mr. Bonvi was in attendance for this scheduled appoint- <br /> ment. <br /> Mr. McQuaid informed Mr. Bonvi Board members inspected <br /> the Southport Treatment Plant area and expressed their con- <br /> cern with the erosion at the east side of the plant. Mr. <br /> McQuaid explained he met with Mr. Yarosh at the site to in- <br /> spect the plant* It appeared there was no immediate danger <br /> f the building slipping off its foundation. Mr, McQuaid <br /> stated he requested fir. Y rush to provide the Board with <br /> .. .detailed plan for temporary erosion control for the treatment <br /> plant, along with a definitive time table in which this will <br /> be accomplished, this request was -never- received.. ' Upon Board <br /> -xtembersinspection of the plant questions were raised as to <br /> s = the percentage of completion originally indicated by Mr. _ <br /> 4 a <br /> Bonvi. R <br /> A <br /> IF Mr. Bonvi "'stated 1 be met with.- the assistant bu lding Inom' ` ' <br /> -spector at the site ' t which time he did discuss the tissue -of <br /> the existing 4erosion :problem. 'Mr. Bo n vi stated at 'Mr. <br /> w Hauc fs .request he did install ' a s ayle system. Gutters will <br /> be installed within the . week and will be routed Niru a <br /> + drainage system to the natural ground. -Mr, Bonvi stated he <br /> 2 <br />