Laserfiche WebLink
garage. Mr. Hinds, the homeowner, went before Conservation. She put a notation <br /> on the Conservation's agenda that the BOH had no idea ghat the existing system <br /> in this garage is turning into because there is nothing on file. Can the existing <br /> stem accommodate this garage? In the meantime, Mr. Harrington must have <br /> received plans because that is what Conservation has on the agenda. Ms. warden <br /> finished her conversation with Mr. Ball and turned the conversation to Mr. <br /> Harrington. She asked Mr. Harrington if he had seem her comments on the Con <br /> Comm's agenda. She asked where the system was tied into because she did not <br /> have this information. She asked if the existing system could accomodate the <br /> garage with six bedrooms including the garage. <br /> Mr. Harrington confirmed that there were four in the main house and two in the <br /> garage. The leaching tren h could do it right noir without the 1. A. system. But, <br /> with the 1. A. system there shouldn't be a problem. <br /> Its. warden stated that she needed to excuse herself from the Boli meeting to <br /> discuss this new information with Bob Sherman, head of Conservation, at their <br /> meeting being held across the hall. She didn't have this information at the time <br /> she was reviewing their agenda. <br /> Mr. Ball asked if this could be considered a two family residence. Is there a full <br /> kitchen in the existing garage? <br /> Mr. Doherty stated that he had no idea. That it was very possible. But, that would <br /> be a zoning issue. He is not in the zone of contribution here. Conservation <br /> Commission requested the I. A. system. As long as he has a previously approved <br /> leaching facility that was installed for six-bedroom. He could have those six <br /> bedrooms right now as far as the BOH is concerned. But, Conservation made him <br /> go to the I. A. So, he brought him back in front of the BOH members because se they <br /> need to acknowledge that he has an I. A. system and there is going to be ars <br /> operation and maintenance with a total nitrogen quarterly for two years, They did <br /> o round and round with the number of bedrooms. Where is a lot more behind <br /> this process. The homeowner has been through this three or four times. <br /> Mr. Ball made a motion to approve the 0 & M. Mr. Santos 'seconded it. Motion <br /> passed. <br /> 7. Variance e gest: Elder Services of Cape Cod & Islands, Inc. Food Certification <br /> Mr. Doherty asked if there was anyone here representing Elder Services, <br /> Mr. Harrington responded that he had spoken with Many Rolanti of Elder <br /> Services. She stated that she would not be conning. But, if he thought here was <br /> going to be anything out of the ordinary then she would be present. Again, he felt <br /> that this variance request was relatively straightforward and did not require her <br /> presence. <br /> Mr. Doherty continued that the DPH is on the bandwagon as far as this is <br /> concerned providing that they've taken the steps to keep the staff up to date on <br /> the regulations. Does the Senior Center meet all the requirements? <br />