Laserfiche WebLink
5. Variance Request: Title V Upgrade, 49 Cayuga Avenue <br /> Mr. Sanicki had submitted a letter dated 04.25.02 requesting that the <br /> following variances be approved: The SAS will be 6' off the street <br /> property lines of Cayuga Avenue and Mohawk Road. The reserve area <br /> will be 3' off the street property line of Cayuga Avenue. The local <br /> variance is that the reserve area will be 87' from the freshwater <br /> wetlands. <br /> Mr. Ball asked Mr. Harrington if he had reviewed this plans. <br /> Mr. Harrington responded that he had reviewed the plans. There was a 4' <br /> variance from the corner of the SAS and the two streets. Along with a 7' <br /> variance from the street property line. <br /> Mr. Doherty asked if the variance for the reserve presented a problem. <br /> Mr. Harrington confirmed that it did present a problem. <br /> Mr. Santos made a motion to deny the request for variances on the 49 <br /> Cayuga property. Mr. Ball seconded the motion. Motion to deny passed. <br /> 6. Variance Request: Title 5 Upgrade, 72 Forest Road <br /> Mr. Harrington stated that this request did not need to be addressed at <br /> this time because the abutters had not been notified in time. <br /> 7. Review of Definitive Subdivision Plan: Bog River Road (2 Lots) <br /> The BOH members took a few minutes to review the engineered plans <br /> for this subdivision. Mr. Santos began by commenting that the plans <br /> referred to a plan to develop a four-foot hood. <br /> Mr. Ball asked if that was like a pool. <br /> Mr. Santos replied that it was basically a shallow elbow. It should be a <br /> deep-footed catch basin, which is four feet deep or within one foot from <br /> the bottom. It states it in the written portion of the plans. But, it doesn't <br /> show it in the plan itself. That is the one thing that caught his eye. <br /> Mr. Harrington continued by stating that there this section was <br /> leachable and wasn't an overflow. <br /> Mr. Santos replied that that was correct. This was a catch basin with <br /> 12" ...to the retention area. They need some floater fuses or dry wells in <br /> this area. If this fills it is going to percolate down and have a chance to <br /> go over the grassy area. <br /> Mr. Doherty asked how long the BOH members had to review it. <br /> 2 <br />