My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/3/2002 BOARD OF HEALTH Minutes
>
10/3/2002 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:12:52 PM
Creation date
3/26/2018 1:43:27 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
10/03/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
amount time, It was fourteen days for him to cone in, take the exam, pay <br /> the fees for the septic application and ultimately provide an as built, H <br /> requested to have a hearing upon receipt of that letter. <br /> Mr. Santos asked Mr. Crocker if he had installed the system at 32 surrey <br /> Place. <br /> Mr. Crocker responded that he had installed that system. <br /> Mr, Santos asked hire if he was aware of the laws governing the <br /> installation of septic systems in this town, <br /> Mr. Crocker confirmed that he was aware of the laws in Mashpee. <br /> Mr, Santos reiterated that this was an illegally installed system, <br /> Mr. Crocker stated that he was the "operator" of the installation for David <br /> Lammers who was the general contractor for the Pikes. He never even <br /> met the Pikes. He never had a contract with therm. He doesn't do the <br /> installation for himself. Mr. Lammers asked him to do the installation, Mr. <br /> Lammers provided the equipment. He supplied the truck. He spoke to <br /> friend of his at Pre-cast concrete, His friend brought the pre-cast <br /> concrete. The Pikes just happened to be there on a Saturday. They <br /> showed up. Mr. Lammers suggested that the Pikes pay Mr. Crocker the <br /> money because he had already paid the pre-cast company. He was <br /> caught in a position where he was originally the operator on the job and <br /> now everyone thought he was the installer. He has installed septic <br /> systems in Falmouth, Barnstable, sandwich, Mashpee, Bourne, Harwich, <br /> Holbrook, Yarmouth, Provinc to n and 11 ellfl et. He did this under the <br /> licenses of Bousfield unitary, Carl F. cavossa and Robert Childs, He was <br /> working under the assumption that that was the situation with this <br /> address as well. He has been caught in a big bees nest of some sort <br /> between Mr. Lammers and Mr. Pike, <br /> Mr, Santos asked if Mr. Lammers had a permit. <br /> Mr. Harrington responded that Mr. Lammers is a contractor not a septic <br /> installer. <br /> Mr. Crocker continued by stating that Mr. Harrington had advised him <br /> that it {would be favorable for him to present an as built with the <br /> coordinates of the septic location for the file. Mr, Lammers who was the <br /> builder. He orchestrated with the engineer and the engineer inspected it. <br /> Mr. Crocker didn't even back fill it. He was just the operator on the job <br /> and had gotten in this and that. He had already paid the pre-cast guy <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.