My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/9/2003 BOARD OF HEALTH Minutes
>
1/9/2003 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:08:11 PM
Creation date
3/26/2018 1:49:46 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
01/09/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 � <br /> Mr. Santos brought up the well issue. <br /> Ms,, Warden replied that town water was brought to that area long ago. <br /> Motion to approve the installation of the FAST system for the <br /> denitrification of the four-bedroom new house and the two-bedroom <br /> garage on the existing system, Mrs Santos seconded the motion. Motion <br /> approved. <br /> Emergency Repairs: <br /> 400 Brassie Way <br /> Mr. Harrington noted that the liquid level was above the flow diffuser top. <br /> The intent is to install a three-bedroom system. There was groundwater <br /> present. The SAS is to be determined upon ground water elevation. Mr. <br /> Harrington recommended that they go to engineering on that particular <br /> property. There were wetlands across the street and variances to <br /> groundwater that are going to be necessary, He spoke with the <br /> homeowner today and he didn't lean that way. He didn"t know what the <br /> adjustment to groundwater was going to be. It brought it.up 2 " and made <br /> the system come up out of the ground. It is going to have to be a raised <br /> system, He was going to let an engineer deal with it. He was not going to' <br /> bother trying to do a design in the Meld. <br /> The board members forwarded their signatures for approval of the <br /> emergency repair certification form with the condition that engineering <br /> plans were going to be needed for this system. <br /> 2 Finn Way <br /> Mr. Harrington noted that there was overflow to the ground visible at the <br /> pit. The intent is to install two 500-gallon chambers with 41 of stone <br /> proposed, They will be using the existing septic tanks <br /> The board members forwarded their signatures for approval of the <br /> emergency repair certification form. <br /> Pine Avenue <br /> Mr. Harrington noted that the block cesspool was structurally failing. The <br /> intent is to install a three-bedroom system with two Soo-gallon chambers <br /> with 41 of stone for the SAS and a proposes! 1500-gallon septic tank. <br /> The board members forwarded their signatures for approval of the <br /> emergency repair certification forms <br /> 36 Redwood Circle <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.