My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/23/2003 BOARD OF HEALTH Minutes
>
1/23/2003 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:03:49 PM
Creation date
3/26/2018 1:50:36 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
01/23/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
with the two other items. <br /> Mr. Santos added that if the stuff starts coring out of the ground then it <br /> would be cut down to fourteen days for them to do something, That was <br /> his opinion. <br /> IIIb. Ball agreed and wanted a time limit on that pumping real soon. <br /> Mr. Ball made a motion to approve the extension until April 15*", 2003, for <br /> submittal of Title V design plans and also require installation of septic <br /> within 30 days of BOH health approval or 45 days from Conservation <br /> Commission approval. The second part of the approval is to maintain <br /> pumping so that it abates any health hazard, which should be done within <br /> fourteen days if necessary. IVIS. Grady seconded the motion. Motion <br /> passed. <br /> APPOINTMENT:T: Michael Grotzke, P.E. - 11 ocean Bluff Drive <br /> Mr, Grotzke was present representing the applicants for I I ocean Bluff <br /> Drive. The applicant proposes to remove the existing septic system and <br /> install a new three bedroom septic system at the above referenced <br /> address. Due to restrictive site constraints, including topography, lot size <br /> and configuration, and wetland setback requirements, the following <br /> variance: setback from the property line. A five-foot variance from the ten- <br /> foot requirement for septic tank and side property line. <br /> He continued by stating that it was an existing cottage that has an <br /> existing septic system. The leach pit was under part of the roadway, Back <br /> in 1999 they had designed and had approved a septic system for four <br /> bedrooms consistent with current "Title V at that time. That system was <br /> 5 <br /> installed in 2002..-They are looking for additional variances. <br /> Mr. Harrington asked him to confirm that the system on the plans was <br /> installed in 2003. <br /> Mr. Grotzke stated that it was not installed. The one that was installed in <br /> 1992 was a tank and a pit. <br /> Mr. Harrington confirmed that in 1992 it was a tank and a pit. <br /> Mr, orotzke stated that they showed this on the larger plan,, He points to <br /> an outline of the leach pit and septic tank.) <br /> Mr. Harrington stated that the plan Mr. Grotzke was now referring to was <br /> designed and approved in 1999. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.