Laserfiche WebLink
IIIb. Harrington replied that it was Bortolotti, <br /> Mr. Santos asked if it had been pumped, <br /> Mrs Harrington responded that he hadn't looked up the pumping records. <br /> However, it was going to be part of his recommendations so that they <br /> maintain the system as is and not create a health hazard until they can <br /> replace it. <br /> Mr. Santos asked when the homeowners were in receipt of the letter. <br /> Mr. Harrington replied that it was 30 days for a health approval. Mrs, <br /> Connolly was requesting until the middle of April. His recommendations <br /> were going to be to approve the extension until April 151h, That's the <br /> extension to submit Title V design plans by April I t'', 2003. The first is to <br /> maintain pumping so that it abates any health hazard and the second is to <br /> approve the extension until April It", 2003, for submittal of Title V design <br /> plans and also require installation of septic within 30 days of BOH health <br /> approval or 45 days from Conservation Commission approval if needed, <br /> which is pretty much standard for wham he puts in the letter. Mrs.' <br /> Connolly's daughter is looking for additional time to get back here and <br /> address this. <br /> Mr. Ball asked when they would pump this system because that would be <br /> a condition of approval. Right? <br /> Mr. Santos replied that they would want it pumped every 30 days until the. <br /> work is completed. <br /> Mr. Harrington was just leaving it open, so if the BOH gets a complaint or <br /> they didn't pump it. They could say at that point that they could keep it <br /> pumped so that there was no health hazard. <br /> Mr. Ball felt that they should have it pumped before they agree to it. <br /> Ms. warden interrupted that Ids, Garron had the pumping records on her <br /> computer and she could review them if they wanted to wait a minute. <br /> IIIb. Santos felt that it didn't matter if it had been pumped or not, what <br /> they have always done is a swap. If they want this extension, he had no <br /> problem. But, it would have to be pumped out every thirty days as stated <br /> within the letter, something has to be done within thirty days. <br /> IIIb. Harrington confirmed that Mr. Santos wanted it to be pumped out by <br /> February II1h, 2003, and maintain pumping to abate any hazards along <br /> 8 <br />