My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/23/2003 BOARD OF HEALTH Minutes
>
1/23/2003 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:03:49 PM
Creation date
3/26/2018 1:50:36 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
01/23/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
up. There is open space behind the property. Mr. Labute gent out and <br /> looked at the p4rperty. There was a chance that there were going to be <br /> variances, So also based upon that. There should be engineered plans so <br /> that the proper notifications take place. <br /> Mr. Ball asked what kinds of variances were needed* <br /> Mr. Harrington responded that they would be property line variances. <br /> Mr. Snow stated that the variance that Mr. Labute mentioned to him was a <br /> g' requirement compromised on his side of the lot in order to dig a hole <br /> the size to accommodate modate the two pits and the tour feet of stone. <br /> Mr, Santos they don't normally require notification on an emergency <br /> repair, It is usually for new installation, correct? <br /> Mr. Harrington responded that at that point he didn't think there were <br /> going to be variances, But, if there were going to be variances,... <br /> Mr. Ball stated that they have never required engineered plans on <br /> emergency plans, only on new construction. <br /> Mr. Harrington responded that they don't usually allow emergency <br /> certifications when there is a need for variances because if there are <br /> going to wetlands or Drell ... <br /> Mr. Santos interrupted and stated that if there is an involvement of <br /> wetlands or wells with questions within the 1001 or whatever. It is for <br /> everybody's protection to have the sidelines* <br /> Mr. Harrington added that if it was to the sideline to the street where it i <br /> town property. He would grant that in the field basically allowing it to <br /> come just inside the ten feet to the street. That was notification to the <br /> town or the BOH. He would let that go for emergencies. But as far as the <br /> properties to the mutters. They are required by Title V to be notified. <br /> Mr, Santos stated that basically Mr, snow was in front of the board <br /> because he didn't want to do the engineering plans, He granted to keep <br /> his costs down and get the system fisc. <br /> Mr, snow agreed that that was his position In this matter. He continued by <br /> stating that when Mr. Harrington gave him an extension, He did so into <br /> December, It was a mistake not to ask for more time. Upon receipt of the <br /> letter he immediately go a hold of Mr. Labute, Mr. Labute agreed to do it. <br /> Everyone else that he was speaking with gage him the typical Cape Cod <br />
The URL can be used to link to this page
Your browser does not support the video tag.