My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/13/2003 BOARD OF HEALTH Minutes
>
3/13/2003 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:25:13 PM
Creation date
3/26/2018 1:52:57 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
03/13/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10 <br /> Mr. Ball asked what they needed to get a decision from Mashpee <br /> Commons, <br /> Mr. Harrington stated that it looked like the installations were going to <br /> happen from September to the end of the year. He asked hover many <br /> systems were they designing at this point in time. Four out of the five? <br /> Mr. Hajjar replied that if might even be three. They have one building that <br /> is completely empty,, The retail building will be under the threshold. It <br /> was at least three. They would probably do four just to get it dome. <br /> Mr. Harrington added that with those size systems with the FAST units... <br /> Mr. Ball Mated that they could get these installed in the wintertime. If it <br /> carne down to that. if Mashpee said yes, the DEP and then it would come <br /> clown to the installations. <br /> Mr. Harrington re-iterated that the DEP was not going to be involved with <br /> this. <br /> Mr. Santos clarified that they would not be involved in the installation of <br /> the denitrification systems. But, the sewer limes would involve the DEP. <br /> Mr. Harrington agreed and clarified that he was not taking about the <br /> sewer line. He was talking about the fall back to the denitrification <br /> systems. If they ultimately get a commitment letter from Mashpee <br /> Commons, They are looking at the fall of 2004 of the next year anyways <br /> to do the sewer lines, <br /> Mr. HaJjar interjected that he understood where Mr. Harrington was going <br /> with his thought process. <br /> Mr. Harrington added that it wouldn't be the end of this year. He was just <br /> looking at this year period for the board and Mr. Hajjar's first initial <br /> agreement and deadline. <br /> Mr. Hajjar added that he wanted to do whatever rade everyone happy. <br /> He was flexible. <br /> Mr. Darrington noted that at this point even if the board gave hire an <br /> extension right now. It looked like Mr. sani ki would have the entire <br /> summer to do the design work because the install wouldn't happen until <br /> after Labor Day anyways. He thought that that would be enough time to <br /> get the design work. done. They would have decent weather. <br />
The URL can be used to link to this page
Your browser does not support the video tag.