My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/19/2003 BOARD OF HEALTH Minutes
>
6/19/2003 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:40:25 PM
Creation date
3/26/2018 1:57:06 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
06/19/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> should get in touch with the association to review and repair, if <br /> necessary, this catch basin. <br /> Mr. Sanicki drew in the berm on the plans for review, <br /> IVIS. Warden suggested that they make it pleasingly aesthetic. <br /> Mr. Ball re-iterated that either the homeowner or IVIr, sanicki were going <br /> to have to look into the repair or maintain of this catch basin because it <br /> was a condition of the approval. <br /> IVIS. Grady made a motion to approve the one-foot variance in the <br /> separation from the SAS to high groundwater, This approval includes the <br /> following conditions: an additional six-inch bears on the let and the review <br /> of the catch basin with the association for possible repair and <br /> maintenanceo IVIr. Ball seconded the motion. Motion passed. <br /> IVIS. Legis asked if she could see a copy of the modified plan, can it be <br /> reviewed? <br /> Mr. sanicki showed IVIS. Lewis the plan and pointed out the placement of <br /> the original bean in relationship to her house and the additional berm. <br /> M'si Lewis asked when they were going to take a formal decision. <br /> This. Grandy responded that the variance has been granted, A formal <br /> decision has been issued* <br /> IVIS. Legis added that she hasn't had an opportunity to shover it to an <br /> outside party, an engineer or lawyer, Whatever, who might disagree with <br /> the variance. Is there an appeal process? <br /> Mr. Harrington responded that there is an appeal process. They have to <br /> request in writing. He added that new Title if doesn't give an appeal <br /> period. The old one was 30 days. He didn't know what the new one wasO <br /> . Flt 2004 Landfill Post-closure Monitoring contract <br /> Nisi Grady began the conversation that she was confused with some of <br /> the figures in the Weston and Sampson contract, she pointed out two <br /> different figures that didn't match. <br /> Mr. Harrington noted that even at the $21004,00 they would give them <br /> face value and choose the lower number. she was further confused by <br /> Horsley & Witten they was $24900.00, <br /> 'I'1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.