My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/10/2003 BOARD OF HEALTH Minutes
>
7/10/2003 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:45:04 PM
Creation date
3/26/2018 1:58:08 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
07/10/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Golub stated that the next step would be to figure out if it was an H20 <br /> r not and put an access to it. If it was not an H2O they will need an new <br /> leach field. <br /> Mr. Harrington suggested that he go back to Warwick since they already <br /> have the septic design basically done on record. <br /> Mr. Golub asked what Mr. Harrington was referring to. <br /> Mr. Harrington showed Mr. Golub the original septic design. <br /> Mr. Golub asked him if if wasn't under the garage. <br /> Mr. Harrington stated that it wasn't shown there, The garage was put in <br /> afterwards. The septic went in July and the garage went in in October. It <br /> was slid forardsp <br /> Mr.-Golub asked Mr. Harrington if he couldn't put a pit in where the leach <br /> pit was supposed to be, <br /> Mr. Harrington stated that they don't allow pits anymore. They have <br /> changed the regulations, - <br /> Mr. Golub wanted to know if they could get a variance. <br /> Ms. Warden stated that that was an option. <br /> IIIb. Harrington re-iterated that the septic gent in July and was added to <br /> this in November and the garage went on soon afterwards* <br /> Mr. Golub figured that they probably didn't realize that the leach pit was <br /> located in that area. <br /> Mr. Harrington noted that he didn't know why they didn't catch it because <br /> the -built on November 1 1h and it was readily avail bleO <br /> Mr. Ball stated that Mr. Golub knew what he had to do. <br /> Mr, Golub asked for something in writing outlining his obligatio ns1w <br /> Mr* Harrington stated that they needed to confirm that the leach pit is H2 <br /> rated at the top, if not, a new design is required. <br /> NEW BUSINESS: <br /> . La plaza Del sol <br /> 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.