Laserfiche WebLink
r <br /> Mr. Harrington stated that it didn't look like the septic was within 101 on <br /> the nett property, That was one of the other requirementsm if you were <br /> inside 101 you would have to make sure there wasn't another septic on the <br /> abutters lots He checked that and the leach pit was in the middle of the <br /> backyard. It was not near the property linen The existing pit would have to <br /> be dug out. <br /> Mr. Lantery confirmed that that was correct. He had notes on the plan <br /> that it would have to be dug out. <br /> Mr. Santos asked if there were any other wells on the other side of <br /> Bayberry Drive. <br /> Mr. Lantery confirmed that across the street the wells were well over 1001 <br /> array. <br /> Mr. Harrington recommended approval for maximum feasible compliance. <br /> Mr. Santos made a motion to accept the plan submitted by Mr. Earl <br /> Lantery in his cover letter of August I g1", 2003 and approve the following <br /> variances: 501 variance from the wells to the leach field because of well <br /> and SAS locations on abutting lots under maximum feasible compliance. <br /> No reserve area for the SAS and eight foot variance to the sideline. Ms. <br /> Grady seconded the motion. Motion passed. <br /> APPOINTMENT: dames Kogut - ch r stone's Restaurant <br /> IVIS. Grady asked if Mr. Kogut was coming to the meeting. <br /> Mr. Harrington replied that Mr. Kogut was not corning to the meeting. He <br /> had faxed something for the board to review, They were going to bring <br /> him back before the board to show proof that he had made arrangements <br /> for servafe certification for his employees. <br /> Mr, Santos asked if he didn't have a proposal for the floor to be repaired. <br /> IVIS. Grady stated that at the last meeting the contract date of 08.04.03. <br /> IVIS. Warden stated that there was a sign on their door statim that they <br /> were closed for renovations for the week. <br /> Mr. Harrington stated that the work should already be done. But, they <br /> hada"t as yet been reached for an inspection. <br /> The board reviewed the fax from Mr. Kogut regarding the dates for the <br /> is servsafe certification* It did specify 15 people minimums However, it did <br /> 2 <br />