My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/8/2004 BOARD OF HEALTH Minutes
>
1/8/2004 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 5:07:21 PM
Creation date
3/26/2018 2:07:03 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
01/08/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> I <br /> t <br /> were literally in hock up to their eyeballs now to just buy the place and <br /> get it open. <br /> Mr. Sall felt that it kind of placed therm in a semi-hardship situation. <br /> Mr. Harrington added that the current system that was in place was a <br /> galley system that was huge. There shouldn"t be any problem with it. <br /> Mr. Sall interjected that Mr. McNulty needed to tell the board that it would <br /> place hire in a some type of"hardship" situation if he were forced to <br /> install the retro-fit before the year was over. Otherwise the board would <br /> not be able to grant hire this request. <br /> Mr. Harrington added that typically they allow people to work on these <br /> types of projects at the end of the summer season when things slow down <br /> at least after Labor Day. If they went to Columbus Day in October they <br /> were rolling the dice with Breather. It ought to be closer to labor if they <br /> wanted to do that. <br /> Mr. Santos suggested that by September 1", 2004, they have plans <br /> submitted to the board for approval with a time frame for installation in <br /> the fall. <br /> Mr. Harrington recommended that they go earlier with the plane such as <br /> .duly 4 1h9 2004. Cape & Islands site work is done. They have the site plan <br /> portion of it done. They only have to revise the plan and ultimately put the <br /> denitrification system on the plan. The DER was not going to see this plan. <br /> Mr. Santos was only suggesting that they give Mr. McNulty the extra time <br /> to gather more financial means to pay Cape & Islands to do the plan. <br /> Mr. Harrington did not want to schedule the date for the plans after Labor <br /> Day because the board usually only met once a month during the summer: <br /> Mr. McNulty didn't know the overall figure for this project. He understood <br /> that they already had the plans from the original system because they did <br /> its <br /> Mrs Harrington added that the number of seats hasn't changed and they <br /> weren't making any major additions to the building'as far as footprint or <br /> going up in stories* There doesn't have to be any big additional requests <br /> or over any limits that would kick therm into DER review. It was merely the <br /> board's approval. <br /> [s. Warden suggested that they have plans for June 1It, 2004. <br /> 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.