Laserfiche WebLink
x <br /> • <br /> connected. He had heat and hot water. The minimal criteria had been net. <br /> He allowed therm to go back in. It would be a very nice house when it was <br /> done. <br /> Ms. Grady asked about the outside with the abandoned vehicles. <br /> Mr. Harrington stated that the police followed up on that item. The trash <br /> was picked up the next eek. There were still some vehicles here. <br /> 15 ShipsWheel <br /> Mr, Harrington Mated that that gentleman went into a nursing home and <br /> the house was sold at auction. A couple just carne in this week and <br /> advised the board that they had purchased it. They were in the process of <br /> cleaning it out. They were given a copy of the inspection report and knew <br /> what had to be done. They knew that it was condemned and would have <br /> to be re-inspected before they occupied the dwelling. <br /> 15 Horseshoe Send <br /> Mr. Harrington stated that they had been dealing with this since 1998. The <br /> original letter had not gotten served properly. It was recently re-inspected <br /> and the original problems were still in existence. He felt that the problems <br /> made it an unsafe structure. They posted the dwelling as condemned and <br /> sent the owner a notification of condemnation and to secure the dwelling. <br /> It was posted a week ago Friday. <br /> 14 Tern Circle <br /> Mr, Harrington stated that he slid obtain a warrant, He went into the <br /> property. He got a call from the contractor who was doing the work. He <br /> had taken at least three plus roll offs of material out of the house. Most of <br /> the house, three-quarters of it, was clown to the sheet rock. They hadn't <br /> taken the sheet rock out yet. They were going to gut and start over. He <br /> wasn't surprised by that choice. That timeline was probably corning up <br /> and he would have to revisit it. He Knew that that house was on the way <br /> because it was mostly gutted. <br /> . 110 Great Neck Toad south <br /> M . Grady asked for an update on the septic installation and water <br /> connection. <br /> IVIS. Warden stated that the water lines were in, but the water testing had <br /> not been completed. However, this was supposed to be completed by <br /> Christmas. <br /> Mr. Harrington had not confirmed that that had been completed, He did <br /> speak with Joey's septic who had been pumping and was Fired to do the <br /> 6 <br /> i <br />