Laserfiche WebLink
5 <br /> Mr. Ball made a motion to approve the plans as submitted with the <br /> following changes: There would be and elimination of a monitoring well <br /> with the testing out of the d-box. The installation start time was by <br /> December V1, 2004. The finish time for the dentrification installation <br /> would be by January 1111, 2005. Any need for an extension should,b <br /> discussed with the board. The water service would be replaced and <br /> sleeved. The variance.from the 10 milligrams of effluent to 25 milligrams,, <br /> Mr. Santos interrupted the motion and offered the following suggestion. <br /> Since they were giving all of these concessions and they were net getting <br /> everything back. He felt that before they opened up for the season both <br /> systems had to be completed whatever the date. First they were told it <br /> was going to close in October. Now it was Thanksgiving and vire were now <br /> on to December 111% 2004. They were not sure when they were going to <br /> shut the motel down. He felt that before they opened up the office or the <br /> hotel. He would like to see beth systems installed, completed and up and <br /> running. if it was April I` or March V% they needed to twice into <br /> i <br /> consideration the harsh printers, <br /> Mr. Kirrane stated that the year round issue was still'up in the air because <br /> of the substantial costs associated with the installation of this kind of a <br /> system, For the economical viability of the complex they were <br /> contemplating a move to a year round use. <br /> Mrs Harrington stated that some of the units were not fully insulated. <br /> Mr. Kirrane stated that this would not be only for the system.but there <br /> would also be a reed for an additional investment in terms insulation and <br /> things of that nature to make probably not all of the units because h <br /> didn't think there was a demand for all of those units on a year round <br /> basis* so there would probably a limited number of those units that wuld <br /> be made available on a year round basis. But, that probably wouldn't begin <br /> until the next season, anyway. He didn't think there would be any problem" -, <br /> having the systems completed before they opened next spring. if it <br /> became problematic because of an unusually harsh printer. Then they <br /> would just come back and ask the board for some indulgence at that time <br /> because obviously the office use is minimal. The complex itself would be <br /> completed by that time. if they had that issue they would cross that <br /> bridge when they carne to it. <br /> Ms. Grady clarified that the completion date for the entire system would <br /> be prior to the next opening date. Correct? <br /> Mr. Santos re-iterated that he wanted the system completed before they <br /> opened the doors on either system, They were not going to split lairs. <br /> i <br /> 2 <br />