Laserfiche WebLink
r <br /> for homes that had no record on filem if they wanted to change that to <br /> state that there was no information on file they would have to confirm the <br /> information in the field,, <br /> Mr. Ball stated that that was one of his concerns. <br /> Nor. Santos asked if 4, ASCI! was word for word out of Title V. <br /> Mr, Harrington confirmed that he was asking about 4., UGIT* <br /> IIIb. Santos agreed that that was the one he was talking about. <br /> Mr. Harrington replied that it was not out of Title V. <br /> Nlr* Santos continued by stating that there was language in Title V that <br /> stated that during inspections there would be a measurement of stone. <br /> j Mr. Harrington corrected Mr, Santos and stated that it was not for <br /> inspections. It was for increase in usage, yes. <br /> i <br /> Mr. Santos continued that it would have to be determined. It was life h <br /> was saying that they would have to go out there and dig it up to prove it, <br /> Mr. Harrington interjected that that was not required at the time of <br /> inspection, it was required if they were adding a bedrooms , It should be <br /> done so everyone knew at the time of inspection. <br /> Mr. Bail re-iterated that he would like to see it changed. <br /> Mr. Harrington re-iterated that Nor. Ball wanted to see the words changed <br /> to the "if no information was available from the time of original permitting <br /> or design.' <br /> Mr. Grad asked if he could ask a question. <br /> Mr. Ball told him he could ask a question in a minute. <br /> Nis. Warden stated the only time they required it was when there was no <br /> Title V information. she told him that that was a good pick up. <br /> Nor. Harrington continued by asking the board members to go under <br /> inspections page two. "All conditionally passed needs beard of health <br /> evaluation. The septic inspection shall be repaired prior to the transfer of <br /> property. A license septic installer shall consult with and obtain a permit <br /> from the board of health to perform the repair. The installer shall consult <br /> 3 <br />