Laserfiche WebLink
maintenance contract for the re-circulating sand filter to include total <br /> • nitrogen quality for two-years and coliforms quarterly for two-year for the <br /> U/V unit. <br /> Mr. Costa asked him to repeat that last statement because he missed. <br /> Mr. Harrington re-iterated the statement and added that it was standard <br /> for the board's regulations. <br /> Mr. Santos stated that they had all of these variances. But, there were no <br /> variances to the wetland. He pointed out the area that Conservation had <br /> delineated this as the work line. Where they calling this the coastal bank <br /> or...? <br /> Mr. Costa stated that they were calling it the edge of the BVW. <br /> Mr. Harrington felt that it wasn't a coastal bank but a BVW. <br /> Mr. Santos noted that there was 65' to the BVW. There was no wording in <br /> the variances for the BVW setbacks. It was what they wanted to see. But, <br /> there was no language on the variances. <br /> • Mr. Costa was under the misunderstanding that the UV was mitigation for <br /> the setbacks. <br /> Mr. Harrington stated that the variances needed to be requested. <br /> Mr. Santos stated that the variances needed to be in writing. <br /> Mr. Harrington stated that he had the reference for him to use. <br /> Mr. Ball asked Mr. Costa if he wanted them to accept the plan with the <br /> following changes to be finalized by the health agent. <br /> Mr. Costa asked if he could revise and then bring them back to Mr. <br /> Harrington. <br /> Mr. Harrington felt that Mr. Costa should speak with his client since it was <br /> a pretty major change to go from a foundation to piles. <br /> Mr. Santos felt that they should continue this until the next meeting. <br /> Mr. Ball made a motion to continue this agenda item until the next <br /> meeting. Mr. Santos seconded the motion. Motion passed. <br /> • APPOINTMENT: Michael Grotzke - 95 Whippoorwill Road <br /> 26 <br />