My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/06/2000 SCHOOL COMMITTEE Minutes
>
12/06/2000 SCHOOL COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2018 5:08:12 PM
Creation date
4/13/2018 2:36:27 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/06/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE SCHOOL COMMITTEE R G LAR MEETING - DECEMBER 6, 2000 PAGE <br /> Motion made by Mrs. Lynch, seconded by Mrs. Lopez, t <br /> approve this position. However, after discussion, it was <br /> suggested to create this position for the remainder of this <br /> school year only. However, this position would be "on <br /> hold" for the next school year. 'There were contractual as <br /> well as responsibility issues to be decided. <br /> VOTE:E: Un nimous <br /> .2 Food Service Update - Mr. McGown commended Food <br /> Service Director Bob Gaboury for his continuing <br /> assistance in obtaining the financial records from <br /> hartwells. As of October 2000, the "Program Balance" i <br /> $46,687.97. <br /> 8.3 Facilities Report - In his report for November, Mr. Coo <br /> noted the following: <br /> Coombs School: <br /> Multitemp. Mechanical, the contractor awarded the bid to <br /> replace the rooftop HVAC units, has scheduled dates to <br /> disconnect the rooftop units, removing existing units and <br /> set in place the new units and complete the installation <br /> December 4-6, 2000. <br /> uashnet School: <br /> •- New blinds were installed in the cafeteria and library. <br /> The remaining back-ordered cafeteria tables were <br /> delivered and assembled. <br /> igrh. 'cool: <br /> The emergency repairs for the wastewater treatment <br /> plant began. The plant will continue to be in service <br /> during the repairs, <br /> System: <br /> The grounds contractor to begin fall cleanup. <br /> Annual quotations for lamps, ballasts and HVAC <br /> supplies were returned and all items have been <br /> ordered. <br /> to n : <br /> Interviews began for the Quashnet School custodial <br /> vacancy. <br /> Request has been made for approval of a custodial <br /> substitute to cover absences that occur during the <br /> school year. <br /> Surplus Equipment - At the ,January meeting, there will <br /> be a listing of surplus equipment that will be voted on. <br />
The URL can be used to link to this page
Your browser does not support the video tag.