Laserfiche WebLink
Motion: Mr. Smith moved to continue the hearing at the request of the engineer to April 26 <br />at 6:03 p.m., seconded by Mr. Sweet. Vote unanimous5-0 <br /> <br /> <br /> <br /> <br /> <br />6:09 Verne T. Porter, Jr., 23 Riverside Road. Proposed reconstruction of existing bulkhead <br />and pilings within same footprint. NOI <br /> <br />Resource Area: LSCSF, Land Under Ocean, Salt March, BVW and Land Containing <br />Shellfish <br /> <br />Verne Porter, applicant, explained the proposed project consists of the reconstruction of the <br />existing bulkhead and the replacement of the existing piles with new wood piles and replacement <br />of the horizontal wood portions with corrugated vinyl sheeting to be attached to the piles. The <br />construction will match and be continuous with the recently permitted bulkhead on the property to <br />the south. He noted the proposed construction on the site plan. He noted the site was not located <br />in the rare species habitat. <br /> <br />The Agent showed some of the pictures of the remnants of the existing bulkhead and the salt <br />marsh. He noted it is a previously licensed structure and the applicant has the right to rebuild it <br />according to Chapter 91 as long as it is built in the same footprint. The Agent referred to a letter <br />from Marine Fisheries and stated the comments can be conditioned into the Order of Conditions. <br />He said there may be some impact in the salt marsh area which is not shown on the plan and <br />recommended a revised plan to incorporate the additional salt marsh areas into the plan. He said <br />he didn’t see any staking of the corners of the project and would make that a condition prior to <br />construction. <br /> <br />No comment from the public <br /> <br />Motion: Mr. Sweet moved to Close and Issue with the conditions recommended by the <br />Agent that the salt marsh is delineated on the plan, seconded by Mr. Smith. Vote <br />unanimous 5-0 <br /> <br /> <br />6:12 Charles A. Cheever, Trustee, 168-S South Sandwich Road. Proposed reconstruction <br />of retaining walls, decks, decking, railings, landings, stairs and tree pruning. NOI <br /> <br />Resource Areas: Buffer zone to coastal bank, coastal bank and Land Under Water Bodies <br />and Water Ways (Mashpee Pond) <br /> <br />Tim Santos, Holmes and McGrath, represented the applicant. He explained the proposed project <br />is the reconstruction and maintenance of existing timber deck, landings and stairs, the replacement <br />of an existing timber retaining wall with a stone retaining wall, the replacement of the existing <br />timber steps to water, the replacement of the existing timber decking a railings for the lakeside <br />deck, tree pruning and the replacement of a portion of the timber retaining wall adjacent to the <br />lakeside deck. The work will take place on an inland bank and within 100 feet of the inland bank <br />and pond. A construction of limit of work will be installed. There will be minor trimming of trees <br />adjacent to the lakeside deck. The existing timber steps to the water are deteriorating and will be <br />replaced. The proposed structures are placed no closer to the wetland resource areas than the <br />present structures. He noted the proposed construction will maintain and improve existing <br /> <br />