Laserfiche WebLink
Summa of Status of Plannin for the flew MashLibrary <br /> S <br /> Current Situation <br /> 1. State brant Current Letter of Award provides for a grant of$2,551,775 <br /> subject to State approval of a Library Co-nstruction Bored Bill. <br /> Representative Eric Tur in ton filed a $100 million Library Construction <br /> .-- <br /> ill on Wednesday, January 1 o,.2007. The Board of Library <br /> Bond <br /> Commissioners roared increasing .the grant by 1 or $382,766 to <br /> iscurrently second on a Waiting List to receive <br /> $2,934,541. Inas <br /> d the Town of Dudley.who has received .most of their <br /> grant <br /> �� rant, � , <br /> and awaits receipt of the remaining.$585,421. <br /> . Paine so Libra Building Consultant for the Board f <br /> � Library <br /> Library commissioners confirmed that it is not a question of 1F iahee <br /> will receive grant, but WHEN. She anticipates a provisional grant <br /> award by .July, 2007 or perhaps August. The State's raktin budget , <br /> for FY 2008 <br /> must include an appropriation of $16 million. The progress <br /> " tion and appropriation bills will b monitored. <br /> of the legislation .. <br /> The <br /> • <br /> 2"�,943 SF library which may be reduced by % will qualify for the <br /> construction grant. The Town will forfeit the grant if chooses to finance a <br /> smaller library. At the time the <br /> Town executes a grant contract with the <br /> state it will rec-eive a yn ant.of 30% of the grant amount. <br /> - <br /> Current Proposals Under Consideration tion - Under the Town BVI � <br /> • - proposals were subrnittd to Architect-Stewart <br /> direction, three library p <br /> • to prepare basic schematics of floor plans and <br /> Roberts. He is pe to � <br /> • - or each and resent his findings at a scheduled <br /> interim opt estimates � <br /> meeting of the P1anni and Construction Committee. <br /> January Planning. <br /> ,and <br /> proposal are: <br /> a. A 153500 SF two-totwo-storY library with steel frame construction <br /> one-story library with good frame construction <br /> 215943 SF two-story <br /> library reduced by % to approximately 21,000 <br /> F which is the library approved under the state grant program. <br /> Joyce Mason has informed the PCC that-she is discussing a Possible <br /> Public/Private Partnership� <br /> with Mashpee Commons Limited under rhi h <br /> _ <br /> 1VICL would finance <br /> the constructio.n of a library and enter into a long-term <br /> lease with the Town. That isall we.know about it. <br />