My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/14/2008 BOARD OF LIBRARY TRUSTEES Minutes
>
10/14/2008 BOARD OF LIBRARY TRUSTEES Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2018 5:11:00 PM
Creation date
5/1/2018 2:56:28 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF LIBRARY TRUSTEES
Meeting Document Type
Minutes
Meeting Date
10/14/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee Public Library <br /> P 0 Box 657 <br /> Mashpee MA <br /> Circulation for September 2008 was 9,887. Year to date, the total is 35,579. The <br /> monthly circulation is almost identical to September 2007 but we are still running <br /> behind on the yearly total. The summer traffic was slower than in the old <br /> location but it looks like patrons have found our new location and'are now using <br /> .the temporary facility. <br /> I will be attending the LEEDS workshop this week in Lakeville. Steve Cook, <br /> P C&Cchairman and Project Manager Rick Pomroy will accompany me. This is <br /> our opportunity to find out what requirements we must meet for the l.EEDs <br /> certification and grant funding. <br /> The pub-bids were opened on October ?1. There were 76 bidders in 12 sections <br /> of work. The combined total exceeds our budget estimates by $130,U00, , <br /> because the HVAC and Electrical bids were higher than expected. Rick Pomroy . <br /> reported that these sections include a lot ,of equipment and technical materials, <br /> and the prices for these components are charging almost daily. The sections that <br /> use more labor than materials came in lower than the estimates. Rick felt this <br /> was a plus because the final round of bids is more labor dependent than material <br /> dependent. Rick felt we. would see lower prices than estimated in these bids and <br /> would 'probably make up the overage. The general contractor bids are due <br /> October 15th (tomorrow) so will soon know if Rick's feelings are correct. <br /> The budget packets were distributed last week and submissions are due. <br /> November 7.2008. Mashpee has been fiscally conservative so we are not in as <br /> dire straits as some neighboring,communities. Mashpee had a decent amount of <br /> Free cash but many of the sources were one time events. The town also saw its <br /> bond rating jump from AA- to AA+. This should be helpful in bonding the new <br /> library. Joyce is predicting that down receipts will be lower than in pest years <br /> because the number of building permits issued has almost come to a halt. She <br /> also expects health benefit and energy costs to continue to increase. A number <br /> of initiatives are underway to try to reduce these two items. <br /> Departments are requested to submit level funded budget requests. Salary <br /> increases are to be made up by cuts to other parts of the budget and the town is <br /> implementing a hiring freeze. This is the first time that has been requested, so it <br /> will be a challenge to cover 'cost of living increases within the existing budget. <br /> Hopefully the energy costs will be lower in the smaller facility and there will be <br /> room for cuts there. <br />
The URL can be used to link to this page
Your browser does not support the video tag.