My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/5/2009 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
11/5/2009 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:24:53 PM
Creation date
5/9/2018 2:37:06 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
11/05/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Village Place 1448 Turnpike Street,Suite 2-11 South Easton,MA 02375 1 T 508/238-5040 1 1=-508/23$-5042 <br /> P 0 <br /> Y � <br /> i <br /> associat-es <br /> www.pomroyassociates.com <br /> Mashpee LibrarLPro eepdate <br /> Meeting j - <br /> �l�i114ri1 <br /> November 5,2009 :30p <br /> 'own Pfficials Present <br /> Joyce Mason [ ,Rend Rem Catherine Laurent f ],Helene DeFoe <br /> Committee Members P ent <br /> Steve Cock,Chairman[ 1,Iry Goldberg,Vice Chairman ,Janice Mills,Clerk <br /> Jae Brait f ], Sheldon Gilbert[ ,Tricia Parolski [ ],Eugene Smargon f ]• <br /> Management Terra.Present!7 <br /> JTA) <br /> Richard Pommy j ],Taylor MacDonald[ ]. <br /> Azenda <br /> I. October 09 Activities — Sub-committee meetings were held on 1 1 and 10/29. Construction meetings were <br /> held on 10111, 10115 and 10/29. An F&E meeting was held on 10/29 and an IT coordination meeting'was held <br /> on 1018. MBI 's Patience Jackson toured the facility on 10127, Mashpee Fire toured the facility on 10127 and <br /> a full tour was given to the Board of Trustees, Friends, Building Inspector and some Committee members on <br /> 10/16. <br /> Progress for the month consisted.of; the site work proceeded very well during the month and the pavement <br /> birder and granite curbing has been installed. Compaction tests were performed on.the pavement sub-base and <br /> the-results were excellent. The crushed shep drainage mats were also installed. l lash ee Commons completed <br /> the Steeple road widening and the curbing which they were responsible for. The trailer transfer tool place and <br /> PA's has transitioned into the new office trailer. The loam is in the process of being spread and sidewalks are <br /> being formed. The flag pole was also installed and new top-of-the-pole hardware was replaced prior to set the <br /> pole. The exterior trim, roofing and siding were completed during the month and exterior painting is conducted <br /> when weather pennits. The entrance lintel was installed which allowed the masonry to be completed and he <br /> entrance storefronts were installed. The interior of the building is also moving along quite well. All necessary <br /> inspections have taken dace and the sheetrock k is app ox 95% complete. Interior pruning is ongoing and the <br /> ceiling grid for the first floor is complete. The elevator has been installed and is operating but not being used. <br /> The gas service has been activated and we are currently waiting for INSTAR to activate the power. No issues <br /> were noted. <br /> 2. Projected November 09 Activities—A Sub-committee meeting is scheduled for 11/12. wring the month of <br /> November expect that all remaining site work will be completed wring the month and finish pavement <br /> installed and signage installed. Exterior light poles, brick pavers, sidewalks., landscaping will also be <br /> completed during this period.The exterior fmishes i.e.: painting, staining and sealants)will also be completed <br /> and we expect to be performing punch list inspections on a periodic basis as items are completed. The exterior <br /> finish millwork such as ornamental brackets and columns will also be completed during the month. with <br /> respect to the interior of the building; we would expect that all interior fmishes and systems will be well <br /> enough along during the month to begin the installation of the interior miflwork. The heating and ventilation <br /> system will be fired during the month and the plumbing and electrical subs will begin installing their respective <br /> finish materials. <br /> . Construction S bedule—No issues to report. Substantial Completion is expected by January 8,2010 and full <br /> building turnover by February 1,2010. <br /> . Direct Payment Request—A direct payment request has been made by IIS industries. Discussion. <br /> Pomroy Associates—Project Update-Library-- 11/5/09 Update Meeting Agenda Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.