My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/8/2011 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
9/8/2011 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:18:19 PM
Creation date
5/9/2018 2:51:23 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
09/08/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 of 2 <br /> Catherine Laurent <br /> From: Taylor MacDonald [ <br /> Sent: Thursday, September 08, 20114:14 PM <br /> To: 'Lance Robson" <br /> : d v @a oroll roo#ing.00m; Catherine L urontt Brad Tripp; rpomroy@pomroyassociates.com <br /> Subject: Punch list walk through notes only <br /> Importance: High <br /> Lance—below please find my notes from today's punch list wally through to merge with your report t <br /> make sure vire did not miss anything. <br /> Dave—my list below can be used for guidance but note that it is not the office punch list; Lance will b <br /> producing an office punch list report. <br /> Torn Hall <br /> 1. Install scupper on high flat roof <br /> . Install scupper on lover roof over rear entrance <br /> . Copula work is outstanding <br /> . Complete skirt flashing at right side of wall which received through gall <br /> 5. Hammer down existing skirt flashing at tar and gravei roof which is blocking weeps <br /> 6. Complete any outstanding fascia splice plates at high,roof <br /> 7.' Gutter returns aro outstanding <br /> . At roof drain which just received new strainer please cut back EPDI 1 inside ring to allow for <br /> proper draining <br /> . Ike-tool re-point and clean through wall masonry brick <br /> 10. Cove base at Assessors to be removed and straight base to be installed <br /> 11. Leak in Town Clerks office to be investigated (pitch pocket directly above) <br /> 12. Leak at back vestibule—take curse off ledge and seal with d rnonic sealer <br /> 13. Install surface mounted flashing at mid-roof transition <br /> 14. -flash corner by handicap parking at front of building <br /> 15. Screw down dens deck by roof drain on-both sides at raid roof to facilitate roof draining <br /> 16. Fasten down cap flashing at mid roof(tar&gravel roof) <br /> 17. Equipment to be resting on walkway pads <br /> 1 . All pipe penetrations to receive pipe clamps <br /> 1 . At bulkhead roof—install reglet, rack drain, and scupper <br /> . General--Clean grounds (use of magnets is fey) <br /> 1.. General—cien any and all roofing debris and materials from roofs <br /> Coombs <br /> . Complete new dint penetrations at dog houses and wall penetrations <br /> . All dint work to receive neva insulation <br /> 24. Complete dint install and insulation once new air handler is onsite—Corolla to coordinate with <br /> Mercury 1echanica I <br /> . Install hatch <br /> . Install guard rails <br /> . Install blocking under dint footings <br /> 9/8/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.