Laserfiche WebLink
i <br /> Page 2 of 2 �. <br /> 2 . Splash.pad for downspouts- on small roof over front entrance <br /> 29. Complete vinyl termination at far end of elementary wing by front entrance ` <br /> 30. Complete skim coat in entrance vestibule and at double doors on second floor <br /> 31. Install neer flashings for flue penetrations (especially over gym office) <br /> 32. Screw down dens-deck at breaks in expansion joint baler red to facilitate draining <br /> 33. Create pitch-pocket around gas fittings and encase with pourable filler % <br /> 34. Complete terminations at roof edges at far end of flat roof between roof where plywood was removed <br /> 3.5. Install trough to move water out of corner where Lance's gall was built <br /> 36. Repair leak found under gable gents in the cafe stairwell <br /> 37. Repair leak at top of ramp under expansion joint(sm roof holding water) <br /> 33. Are individual expansion joints needs on srn flat roofs? <br /> 9. General—Clean grounds (use of magnets is key) <br /> - 0. General—clean any and all roofing debris and materials from roofs <br /> oasbnt <br /> 1. At edge of roof on large rip area filed sheet to be nailed or batten installed <br /> 2. Complete EPDi l base flashing on lower flat roof. <br /> 3. R&R area by air handler to be extended 20-25 feet to right to include entire corridor <br /> . Credit to be provided for re-used pavers <br /> 45. Repair leaks to left an'd right of air handler <br /> 46. General—Clean grounds (use of magnets is key) <br /> 4 <br /> 7. General'—clean any and all roofing debris and materials from roof <br /> Thank you, <br /> Taylor MacDonald <br /> Pomr y Associates, LLC <br /> 448 Turnpike Street, Suite 1-1 <br /> South Easton, IIIA 02375 <br /> T(508) 238-5040 <br /> (503) 648-2661 <br /> F (508) 238-5042 <br /> 9/8/2011 <br />