My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/8/2011 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
9/8/2011 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:18:19 PM
Creation date
5/9/2018 2:51:23 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
09/08/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> Page 2 of 2 �. <br /> 2 . Splash.pad for downspouts- on small roof over front entrance <br /> 29. Complete vinyl termination at far end of elementary wing by front entrance ` <br /> 30. Complete skim coat in entrance vestibule and at double doors on second floor <br /> 31. Install neer flashings for flue penetrations (especially over gym office) <br /> 32. Screw down dens-deck at breaks in expansion joint baler red to facilitate draining <br /> 33. Create pitch-pocket around gas fittings and encase with pourable filler % <br /> 34. Complete terminations at roof edges at far end of flat roof between roof where plywood was removed <br /> 3.5. Install trough to move water out of corner where Lance's gall was built <br /> 36. Repair leak found under gable gents in the cafe stairwell <br /> 37. Repair leak at top of ramp under expansion joint(sm roof holding water) <br /> 33. Are individual expansion joints needs on srn flat roofs? <br /> 9. General—Clean grounds (use of magnets is key) <br /> - 0. General—clean any and all roofing debris and materials from roofs <br /> oasbnt <br /> 1. At edge of roof on large rip area filed sheet to be nailed or batten installed <br /> 2. Complete EPDi l base flashing on lower flat roof. <br /> 3. R&R area by air handler to be extended 20-25 feet to right to include entire corridor <br /> . Credit to be provided for re-used pavers <br /> 45. Repair leaks to left an'd right of air handler <br /> 46. General—Clean grounds (use of magnets is key) <br /> 4 <br /> 7. General'—clean any and all roofing debris and materials from roof <br /> Thank you, <br /> Taylor MacDonald <br /> Pomr y Associates, LLC <br /> 448 Turnpike Street, Suite 1-1 <br /> South Easton, IIIA 02375 <br /> T(508) 238-5040 <br /> (503) 648-2661 <br /> F (508) 238-5042 <br /> 9/8/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.