My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/7/2012 DESIGN REVIEW COMMITTEE Minutes
>
8/7/2012 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2021 12:24:44 PM
Creation date
7/9/2018 3:25:58 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
08/07/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Committee Recommendations <br /> 1. Test pits for stormwater should he done before construction specs. <br /> . Change Lady $Iipper Lane name. Also, all names need to he reviewed by Town Address <br /> Working Group. <br /> . Light pole or any other structures that would interfere with Fire Tower truck overhang should <br /> be kept away from first traffic round-about. <br /> 4. Suggest consider putting hydrant in first traffic round-about. <br /> 5. Cho stormwater management plan as part of construction documents and long-term stormwater <br /> operation and management plan needs to he done as part of 40B application. <br /> . Grade entire rain garden area adjacent to proposed parking lot but only plant half and separate <br /> rest from temporary berm. <br /> Motion: Glen Harrington motioned Pian Review to approve the recommendations listedw Drew <br /> McManus seconded the motion; and it was unanimously passed by Plan Review. <br /> Motion: Mary LeBlanc motioned Design Review approve recommendations as stated by Plan <br /> Review motion; and Jonathan Furbush seconded the motion# Motion unanimously approved by <br /> Design Review. <br /> Marybeth Blake & Ronda Crowley <br /> Requests dog grooming, and small doggie.dav care <br /> No one appeared; no action taken. <br /> Reorganize Des!- n Review Board of selectman — Poligy No,46U.,Matter tabled. <br /> Approval of Minutes <br /> Pesign Review <br /> Jonathan Furbush approved the minutes of the Design Review and Plan Review combined meeting <br /> of June 19, 2012. <br /> Plan Review <br /> Joel Clifford motioned to accept the minutes of the Design Review and Flan Review combined <br /> meeting of dune 19, 2012; Catherine Laurent seconded the motion; and it was approved with Torn <br /> Fudala, Crew McManus, and Joyce Mason abstaining. <br /> old jo u rnent,,,This joint meeting of Design Review and Plan Review adjourned at 9:55 a.m. <br /> Respecffully submitted a <br /> iliherti <br /> ecording Secretary <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.