r <br /> Mashpee Warnpanoag Affordable Housing <br /> 18 Meetinghouse Road <br /> Plan review <br /> Page three <br /> The slope needs to be well protected while grass germinates. This could be accomplished by <br /> either sodding the slope or covering the area with jute netting that also allows for grass <br /> germination at the same time. <br /> . The plan indicates road names as 1W)F "B", and "c". Names should be selected and shown on <br /> the plana. <br /> Sheet 3 of 1 <br /> 1. The baseline of Load "A" runs across the cul-de-sac without the appropriate change in grade. <br /> It should reflect the sane change as shown on Sheet 7 of 12. <br /> 2. There needs to be more grade definition around each of the cul-de-sacs to insure'that there <br /> are no significant flat spots where water could accumulate. The grades in some instances are <br /> very flat. <br /> 3. The grade percentages and vertical curve data should be shown on the full size plans. <br /> Sheet 8 of 1 <br /> 1. The double catch basin rim grade appears to be too'high for the edge of pavement in that <br /> area. There should be additional grades around the edges of pavement to assist in the <br /> construction process. <br /> . The road grade between stations 6+50 and 0+50 is less than 1% as req ui red by the <br /> Regulations (Section Vi I l (C)(1). Admittedly this is somewhat picky as the grade is 0.97% <br /> however it does not conform. <br /> Sheet 9 of 1 <br /> 1. The proposed hydrant location in the cul-de-sac will be difficult to access by fire apparatus. It <br /> is recommended that it be located no more than 6' behind the edge of pavement. The main <br /> (steamer) connection should fake the street. The setback requirement would also apply to <br /> any other hydrants shown on the plans. <br /> Sheet 10 of 12 <br /> 1. The,construction tracking pad needs to be wider to accommodate large construction vehicles. <br /> The radius should also be a minimum of 20 feet. <br /> . It is recommended that the erosion control notes also include a requirement for placing filter <br /> fabric under all gates until they are ready for use. <br /> . There needs to be a stormwater management plan for construction conditions as well as for <br /> maintenance of the facilities after construction is complete. This should include appropriate <br /> measures to prevent sediment from collecting in SWMA and especially the proposed <br /> leaching pit wicks prior to area stabilization. Post construction measures for maintenance <br /> should be spelled out in detail for use by the project Owner. <br /> Sheet 11 of 1 <br /> 1. The plans do not show a typical cross section for the roads. Although they are shown on the <br /> smaller Bureau of Indian Affairs plans they should also show on the lamer set. <br /> . -There is no sidewalk section shown. see section I (1) of the regulations, <br /> 3. Catch basin and manhole details should show a ring of cement concrete around each casting <br /> set to a width and depth of approximately 12 inches and extending to the top of the binder <br /> course of pavement. <br /> 4. The flared end section should show riprap placed under and behind the end for at least 2 feet. <br /> This will assist in preventing scouring at the end of the flared end and potential dislodgement <br /> of stone. <br /> 5. For the rain garden detail there is no catch basin. Change nomenclature to wick. <br /> 6. For the wick detail, the frame and gate should be mortared in position around the riser. <br />