Laserfiche WebLink
February l 5, 1996 2 BOARD OF HEALTH <br /> Mr. Cram motioned to approve plans as presented pending the health agents final <br /> review and approval and to grant a variance from the regulation which requires the <br /> installation of a reserve area, Mr. Ball seconded, all agreed. <br /> . Septic repair rant update - Mr. Doherty will follow-up on the matter. <br /> .) Emergenc failure certification 27 Saddleback Road & 192 lir ret Avenue <br /> 27 SADDLEBACK ROAD - Mr. Evans relayed, `phis failure was discovered by a <br /> septic inspector." "I inspected the site and found sewage hacking up."' <br /> Board members forwarded their signatures to the "Emergency Repair <br /> Certification" form. <br /> 192 1 I1 IGRT AVIFNU - fir. Evans relayed, "I inspected the site and found the leach <br /> bed lacking up into the septic tank which is spilling onto the driveway." I may require an <br /> engineering design.' <br /> Board members forwarded thei <br />