Laserfiche WebLink
I <br /> MTNUTES September 5, 1996 6 BOARD of BEAU <br /> Mr. Cram recommended Board members allow Mr. Elloian 14 calendar days in <br /> which to comply with the original verbal agreement. <br /> Agreed. <br /> . Variance„request, 75 Cayuga Avenue - Mr. McQuaid relayed, "The applicant is <br /> proposing to tie into town water.» "A ' local variance is requested from the proposed <br /> on-site leaching facility to abutting well #79 Cayuga Avenue)." <br /> Mr. Ball motioned to grant a 50' local variance from the proposed on-site leaching <br /> facility to abutting well, I&. Doherty seconded, all agreed. <br /> . Emergency failure certification 17 Bowswit Point Road - Mr. McQuaid relayed, <br /> "A septic inspection was performed due to the impending sale of the property." The <br /> septic inspector contacted this office because he was concerned about groundwater <br /> elevation." "I went out there and couldn't determine precisely whether or not the pit was <br /> m groundwater." "I told him to pump out the tank and pit and let it sit for twenty-four <br /> hours.' "I went out the following day and indeed the pit was full.ofgrater." "I certified it <br /> in failure." "We are requiring an engineered plan because of its proximity to the wetlands <br /> and groundwater.' <br /> Board members forwarded their signatures to the `Emergency Repair <br /> I <br /> Certification" form. <br /> *OLD BUSINESS <br /> High School Up. ate <br /> Mr. McQuaid relayed, "'I informed Selectmen Costa that if the Board ofSelectmen <br /> decide not to accept the school until it's completely constructed and accepted that we <br /> would back the Board of Selectmen 100%.1)5 <br /> Board members agreed. <br /> Letter from D.E.P. re: Fern Lane Marco <br /> Mr. Ball stated, "I would life D.E.P. to clarify where they deternaine the edge of <br /> the wetlands ," <br />