Laserfiche WebLink
r <br />BOARD of SELECTMEN Page <br />MINUTES <br />_TUESDA , FEBRUARY 161 993 <br />BUDGET WORKSHOP: <br />Cape Cod Tech Assessment <br />It was noted that the sum of $378r630 is the actual <br />assessment figure. <br />DPW Salary/Wage: <br />A new custodial laborer is proposed for a sun of $18,000. <br />It was noted that privatization will be reviewed. <br />DPW Capital: ol: <br />The sun of $78,000 is proposed to fund two small trucks and <br />one dump truck informed Mr. W riten our. He noted that $15,000 <br />has been collected from road work funds to allow the purchase of <br />the second small truck, <br />The capital equipment. for the DPW was prioritized by the DPW <br />Director. Mr. Taylor noted that the DPW has not purchased any <br />equipment since 1989. <br />Five priorities of Capital Equipment <br />1 pick up truck with plow frame <br />1 medium duty dump truck <br />1 pick up truck <br />l medium duty dump truck - FY 95 proposal <br />1 loader (possible lease purchase) - FY 95 proposal <br />Snow and Ice Control: 4 <br />Recommendation is level funded, <br />Trash Expense: 0: <br />r. W ritenour indicated that only % of the solid waste <br />budget derives from the user fee system. In the future, we may <br />want to consider are increase in user fees noted Mr, Writenour, . <br />The current dump sticker fee i $35-00. <br />8:00 p,m, Selectman Mills left the Meeting, <br />