Laserfiche WebLink
BOARD of SELECTMEN Page <br />MINUTES <br />M o A r E 7f 1993 <br />Robert Sherman re. Nutrient Loa i •+� <br />r. Crawford presented a slide presentation related to the <br />increase of nitrogen into the ecosystem. The increase of <br />nitrogen into the water table results in an invasion of different <br />plant species informed Dr. Crawford. <br />Areas discussed included; Sedge Loot Bond and the Child's <br />River which was noted to contain high concentrates of nitrogen. <br />There is more biomass in the Child's River noted Dr, Crawford. <br />The high algae content causes eel -grass decline which poses an <br />impact on the scallop habitat. Eel grass is used as a nursery <br />ground for scallops noted Dr, Crawford* <br />As a result, the increase in nitrogen from septic systems, <br />acid rain and lawn fertilizers decreases the shellfish and plant <br />habitat informed Dr. Crawford. <br />Nis. Geist indicated that the nitrogen loading to the coastal <br />ecosystem is a dangerous situation resulting in habitat <br />destruction and fish kill.. <br />Waguoit Bay is one of twenty rational Estuarine Research <br />Reserve sites in the Country informed Nis. Geist. Wa uoit Bay has <br />been selected as a Land Margin Ecosystem Project to aid in <br />solving the problem of nitrogen loading into natural ecosystems. <br />Nis. Geist noted that the problem is global. <br />The Cape Cod Commission supports the nitrogen loading rate of <br />ppm parts per million informed Mr. Sherman to protect the <br />public drinking water and allow for some protection to the <br />ecosystem and coastal waters. <br />Any septic upgrade is under the jurisdiction of the <br />Conservation Commission indicated Mr. Sherman, His computer <br />program aids in determining the nitrogen levels. We may have to <br />consider lower level standards in some circumstances informed <br />Mr. Sherman* <br />For an example, Mr. Sherman- indicated that a 24x34 house on <br />a 20,000 square foot lot with two bedrooms is estimated at <br />.1 pram. A four bdroom home on the same size lot is estimated <br />at 10 ppm. <br />40 <br />