My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/02/1993 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
11/02/1993 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 5:20:39 PM
Creation date
8/10/2018 11:54:51 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
11/02/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Katherine Brown , Mas pe resident stated she is anxious to hear <br /> about what environmental stud ie8 were done on each site . <br /> Mr . Dinizio explained soil scrop les were taken from each ,i tea No <br /> contamination or hazardous mater-lal was found on either site ',, Ms , <br /> Brown asked what will the environmental impact be , what will have <br /> the least impact 'to water , anirnal life , etc . ? <br /> Tom Fudala stated the '151 site has endangerid species identlfl�d <br /> and 18 entirely within a rechar geN area and is near the Qua shnet <br /> River and is within the proposed National Wildlife ref'uge. The <br /> Center site does riot have identified endangered species , only a <br /> portion is w-Ithin a recharge area and it has an area of wet"land . <br /> The center site would have the least environmental impact. <br /> M-1cha,e] Peese , West Dennis , stated he is concerned about the <br /> unique environmental qual -i Lies to the Center s-ite . He be] ieves <br /> the area has an underground stream, flowing to the Mashpee Rivet� <br /> and Waquolt Bay and effecting the whole watershed. <br /> L <br /> Tom exp la. .1ned 'thi's s4te -is a recharge area for the Mashpeo. river <br /> which flows to Popponesset Bay, The 1 1,3 1 site is on Quashriet <br /> River which flows .to Waquoit Bay . No matter where you go in town <br /> you w-ill be in the recharge area for one . <br /> mr . McGee asked about the Performing arts center , -is it a done <br /> dea <br /> ] , whet , w <br /> -P -01 `-t be on the site?l I <br /> The Committee reviewed the 15] plan and sI'tinq pr-oposa s 13 o m e, <br /> plans work with the performing arts center some don ' t. <br /> Ms . Hendricks thir*s the school makes more sense at the 1 '5-] site <br /> because of 'the access. <br /> Ms . Crowley stated there are jobs there (at Stop and Shop ) , the <br /> library Is there , it already has town water . <br /> Mr . McGee asked about putting -the s�hool on the base? <br /> Tom e)<plained this 18 StApposed to be a community center , not just <br /> a school bulld-ing . The Center site was looked at because a <br /> major'Ity of students are 'in this part of town , they could walk or <br /> b 1 d.t i -ter school ike to school and t.-ise the faci 1 .0 es af <br /> Mr. McGee asked if the Committee sees plans to build in that ( '151 <br /> area) of town? Doesn ' t Flelds Point have permits to build many <br /> houses? Isn ' t there land avallable between the Quashnet River <br /> and the rotary? <br /> To e>(pla-ined Fields Point does not have the zoning or permits to <br /> do a 'large amount of residential housing they had planned . The <br /> available land towards 28 -is commeltrcial , riot residential . <br /> Steve Gree lish does not agree with Tom' s assessment. The r 1 <br /> center- of the population , at the time when high school is ful ] <br /> 'is yet to be determined ,,, There -is available land on that side of <br /> town . <br /> Tom exp I ai nod that th i:s I and (Center s w J 11 be, deve I aped i f <br /> we don ' t put a schoc] on i t. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.