My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/21/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
6/21/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 5:10:30 PM
Creation date
8/10/2018 1:29:02 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
06/21/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DISCUSSION WITH ARCHITECT <br /> Today ' s discussion is primarily on roofs . They brought a model with various <br /> roofs . <br /> Ed Frenette suggested the committee meet with the architects every two <br /> weeks , going forward . The design team needs more than 4 days between <br /> meetings . <br /> He also suggested the next meeting be on Wednesday , July 6th instead of <br /> Tues , the 5th . <br /> THERE Is No MEETING NEXT WEEK (JUNE s ) . <br /> The next scheduled meeting is Wednesday , July 6th , with the architects . <br /> The Tuesday , July 12th meeting is committee only . <br /> Flay said they have addressed the concerns from last week -- secondary entry , <br /> extra room in the health suite , roofs . <br /> The next step will be to blow up the floor plan to review hallway , door <br /> locations , etc . <br /> Presently , the sq . footage is 182 , 500 , without the sewage treatment plant. <br /> + <br /> Michael Pare asked for small prints of the layout for subcommittee use . <br /> Ray presented a rendering of the 7 & 8th grade secondary entry . He said <br /> they are happy with it . <br /> The material has not yet been decided . It is all a function of dollars . <br /> The way it is drawn on this plan , the roofing material is preform metal <br /> panels. <br /> Paul ' s concerns about metal are the noise during rain and corrosion <br /> problems from acid rain . <br /> Norris McLeod said they have used it on 4 schools . with a kynar finish it <br /> holds up well . <br /> Ray presented models to look at the different roof forms . <br /> He prepared a vaulted , long house roof . <br /> Bill Martiros doesn ' t think the "arrow" portion of the building has that <br /> much significance <br /> Ed Frenette said they are looking for a shape which " invites" you into bath <br /> entrances and if they can , they will try to provide some symbolism. Peter <br /> mentioned that Joan Tavares was sensitive about the arrowhead symbolism'. <br /> Ed suggested the design team study i t. It does not "have to be" this form. <br /> Ray said today the roof shapes are more important* They would like to come <br /> to closure on the roof <br /> He presented the other choices : an off center , sloped , cape cod roof . The <br /> slope works nice with the dining area and will work well with the theater -� <br /> higher roof over the stage <br /> Paul asked about cost between this and vaulted roof? <br /> Ray said he does not think there is much difference between the two.. <br /> Ray then presented a roof , moving the peak back to the center , this give a <br /> typical , gabled roof . This i s Ray and Ed ' s least favorite . It does not say <br /> Cape cod. <br /> Janice 1iIces the off center peak because of the possibilities in the <br /> theater ; it lends itself to what is needed . <br /> Pau-1 thought the vaulted roof looks like there are additions to the building . <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.