it meets the budget , they can thea begin to look at life cycle bene f i is
<br /> During the workshop they. always talked about durability and many
<br /> recommendations were discarded because of durability issues .
<br /> Interior Partiticons
<br /> -toilet partitions -change material. save $11 , 0006
<br /> -- gym folding parti.tio3-is
<br /> at electric foldina curtain - save $112 , 000
<br /> b , standard net vinyl curtain - add $110 , 0006
<br /> Classroom corridors - circulation change - add $300 , 000 -P
<br /> - ca.f eteri a. doors to open outside to patio - add $16 , 000 .
<br /> elevator size and capacity change - save $5 , 0009
<br /> - eliminate wheel chairl i ft- save $12 , 0000
<br /> Interior Finishes
<br /> glazed face t�.ie - reduce amount- save 0 , 000 ,
<br /> -- curtain wall admin/cafeteria reduce by 25% -- save $26 , 000
<br /> �- flooring rubber tile - save $160 , 000
<br /> or quarry ti' le - save $53 , 000 .
<br /> -- stair treads-- 3 alternatives and their associated sa.vin s ,
<br /> gym wall to CNiILT save $85 , 000
<br /> - ceiling finishes in classroom choices and associated savings
<br /> reduce quarry t 1le in lobby - save $11 , 500 ,
<br /> no paint in service area finishes- save $7 , 500
<br /> -- svnt.heti c gym floor - save $60 } 000 . Bill suggested the Committee try to
<br /> pwd . Raa.y suggested looking at lower 'rade of wood for savings ,
<br /> ,
<br /> - corridor ceiling accent- add $60 , 0009.
<br /> classroom walls _ change material $105 , 000 #
<br /> tol_let room wall finish - save $30 , 000 .
<br /> -- ground face block in corridor walls save $80 , 000 .
<br /> Fittings and Equipment
<br /> toilet accessor les � ��s� stainless steel -- add $1 , 500 #
<br /> changing lockers - delete - save $8 , 0006
<br /> reduce team room g��m lockers - save $3 2 , 000 ,
<br /> pr-.0v ids commun ' its lockers � add $4 , 500 ,
<br /> Electrical
<br /> - separate service for STP save $2 , 5000
<br /> - delete emergency generator- $24 , 000f
<br /> - eliminate electric closets on second floor but it increases risk
<br /> of operation
<br /> from capper to aluminum feeders � save 10 , 000
<br /> --
<br /> primary metering- owner buys equipment but will have to maintain it f
<br /> There is a. savings on the electrical consumption*
<br /> -- el i.mi nate theatre* a.l lighting -� saves 151 , 000
<br /> -- multi level switch at office - delete -- save $1 , 3000
<br /> -- delete 13-gh-ting protection- save $29 , 000
<br /> delete satellite antenna- save $5 , 600
<br /> -
<br /> combine communicat ions systems � sa��e 27 , 800 .
<br /> Mechanical
<br /> delete compressed air in Labs -- save $4 , 700 ,
<br /> - undersl.a.bs storm and sanitary save $4 , 400 ,.
<br /> duel fuel bUrner for hot water - add $3 , 4001,
<br /> - auto flush faucets - add $4 , 900 .
<br /> -W auto fillsii water closet -- add $15 , 6001
<br /> - $ D 700
<br /> eee pp ,
<br /> chance sprinkler material � save $� ,���� .
<br />
|