Laserfiche WebLink
it meets the budget , they can thea begin to look at life cycle bene f i is <br /> During the workshop they. always talked about durability and many <br /> recommendations were discarded because of durability issues . <br /> Interior Partiticons <br /> -toilet partitions -change material. save $11 , 0006 <br /> -- gym folding parti.tio3-is <br /> at electric foldina curtain - save $112 , 000 <br /> b , standard net vinyl curtain - add $110 , 0006 <br /> Classroom corridors - circulation change - add $300 , 000 -P <br /> - ca.f eteri a. doors to open outside to patio - add $16 , 000 . <br /> elevator size and capacity change - save $5 , 0009 <br /> - eliminate wheel chairl i ft- save $12 , 0000 <br /> Interior Finishes <br /> glazed face t�.ie - reduce amount- save 0 , 000 , <br /> -- curtain wall admin/cafeteria reduce by 25% -- save $26 , 000 <br /> �- flooring rubber tile - save $160 , 000 <br /> or quarry ti' le - save $53 , 000 . <br /> -- stair treads-- 3 alternatives and their associated sa.vin s , <br /> gym wall to CNiILT save $85 , 000 <br /> - ceiling finishes in classroom choices and associated savings <br /> reduce quarry t 1le in lobby - save $11 , 500 , <br /> no paint in service area finishes- save $7 , 500 <br /> -- svnt.heti c gym floor - save $60 } 000 . Bill suggested the Committee try to <br /> pwd . Raa.y suggested looking at lower 'rade of wood for savings , <br /> , <br /> - corridor ceiling accent- add $60 , 0009. <br /> classroom walls _ change material $105 , 000 # <br /> tol_let room wall finish - save $30 , 000 . <br /> -- ground face block in corridor walls save $80 , 000 . <br /> Fittings and Equipment <br /> toilet accessor les � ��s� stainless steel -- add $1 , 500 # <br /> changing lockers - delete - save $8 , 0006 <br /> reduce team room g��m lockers - save $3 2 , 000 , <br /> pr-.0v ids commun ' its lockers � add $4 , 500 , <br /> Electrical <br /> - separate service for STP save $2 , 5000 <br /> - delete emergency generator- $24 , 000f <br /> - eliminate electric closets on second floor but it increases risk <br /> of operation <br /> from capper to aluminum feeders � save 10 , 000 <br /> -- <br /> primary metering- owner buys equipment but will have to maintain it f <br /> There is a. savings on the electrical consumption* <br /> -- el i.mi nate theatre* a.l lighting -� saves 151 , 000 <br /> -- multi level switch at office - delete -- save $1 , 3000 <br /> -- delete 13-gh-ting protection- save $29 , 000 <br /> delete satellite antenna- save $5 , 600 <br /> - <br /> combine communicat ions systems � sa��e 27 , 800 . <br /> Mechanical <br /> delete compressed air in Labs -- save $4 , 700 , <br /> - undersl.a.bs storm and sanitary save $4 , 400 ,. <br /> duel fuel bUrner for hot water - add $3 , 4001, <br /> - auto flush faucets - add $4 , 900 . <br /> -W auto fillsii water closet -- add $15 , 6001 <br /> - $ D 700 <br /> eee pp , <br /> chance sprinkler material � save $� ,���� . <br />