HVAC- split system DX cooling- sage $122 , 000
<br /> or total air conditioned- acid $440 , 000 .
<br /> -
<br /> indirect fired gas furnace for gym save $9 , 200 .
<br /> Site Development
<br /> -- reduce student parking by 90- save $73 , 800 .
<br /> reduce faculty b 100- save $82 , 0000,
<br /> - tennis courts - reduce by 4 save $112 , 000 .
<br /> reduce by 6 save $168 , 0000
<br /> - delete practice football field - save $64 , 900 .
<br /> -- delete bleachers - save $67 , 200 .
<br /> - delete entire football area, fl.eld, track, bleachers save - $342 , 000t
<br /> -- delete l baseball , 1 softball , 2 soccer save $296 , 0000
<br /> - sing_le entry road- save $33 , 500 .
<br /> - delete irr igati.on system. save $112200001
<br /> - reduce landscaping by 1/3 -- save $56 , 00001
<br /> by /3 save $112 , 000 .
<br /> - reduce pav i rig and walks by 1/5 saire $251 , 3000
<br /> 1/2 save $628 , 2006,
<br /> - feature drive single lane- save $33 , 500 .
<br /> reduce clear and grub area save 33 , 000
<br /> .
<br /> - change material of s tormwate r piping- save $19 , 300 ,
<br /> - change curbing to precast- save $117 , 600 .
<br /> - reduce size of parking stalls - save $84 , 000 .
<br /> delete flagpoles - save 8 , 400 ,
<br /> - combine fire and domestic water-- save $13,4000 ,
<br /> - rod uC e paving th i s ktie s s-- save $92 , 0004
<br /> -- eliminate parking lot islands --- sage $50 , 000 .
<br /> --- develop drop off closer to school at no . e st �o��n�r�- sa�f� � , 000 ,
<br /> - rediae on site materials for fill and subdrade -- save $80 , 000
<br /> - cast in place concrete not pavers save $48 , 000
<br /> - create busd.rop off at fields- add $4 , 500 1
<br /> - create separate student drop off area - add $3 , 000V
<br /> -- install turning lanes at entrances - -add $28 , 000
<br /> - school proximity signs - Add $1 , 000 .
<br /> - create rotary at major interchange and main access-- save $80 , 000 ( from
<br /> cost of signal ) . Torn FLida.la does not think it would work wl' thout land
<br /> aoquisitio *
<br /> locate track and football field to NE corner -- save $18 , 0000
<br /> - restrict traffic as SE corner of the campus- save $3 , 000 .
<br /> - delete hallf.iel.d lighting- save $151 , 2000
<br /> - metal halide lighting - a.dd. $11 , 200
<br /> Planning and Programming
<br /> delete auxiliary gym - save $350 ; 000
<br /> delete home arts suite- save $50 , 000
<br /> -- delete athletic directors office- save $20 , 000
<br /> W
<br /> delete multi experience lab - save $110 , 000
<br /> �-
<br /> building footprint save $300-400a000 ,
<br /> Shannon Scarlett also had some stig gest ions . Moving the circulation system
<br /> away from the s e ry ry and get it to the other side of the dining facility
<br /> for access to the germ.
<br /> Locate lei.stire services office off the main lobby, use as a secondary
<br /> reception area ;
<br /> secur..ity prohl ein with the egress off of the main entry vestibule . Ray
<br />
|