My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/1/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
11/1/1994 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 5:20:49 PM
Creation date
8/10/2018 3:18:52 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
11/01/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a <br /> the duel fuel . <br /> *The committee agreed to take the $300 , 000 savings and investigate a block <br /> building <br /> 6 . Delete 1 overhead coiling door . Bob explained the custodial staff <br /> recommended this, 3 doors are too many. <br /> Paul said ro l l up doors require a lot of maintenance. 99% of the traffic is <br /> foot traffic. He suggested using l roll up and one 7x7 door . <br /> Ed said it depends on how you discipline your staff , they may use the roll <br /> up anyway. <br /> Paul also suggested eliminating the loading dock . He spoke with staff at <br /> his buildings and they agree . He suggested i t be replaced with a hydraulic <br /> s i zzor lift, This i s not just to out money , it functions Bruch better. <br /> Bob said he won't get argument from them. <br /> They agreed to take $2 , 000 from #60 <br /> 7 . Because the building i s now block , this savings is now less. <br /> Agreed to take $3 ,500 . <br /> $442 , 000 in savings so far . $1 , 162 , 397 left to eliminate. <br /> All figures include profit and overhead . <br /> Committee went through the list again. <br /> 3. Blinds . Merry sue said it is difficult to darken a room to show <br /> anything on Tv monitors without blinds . <br /> Committee agreed to take 1 /2 for $15 ,000 savings . <br /> 13, Ent rance Door , Ed said they can do just as good a job with hollow metal <br /> but it will be a maintenance problem for sure. <br /> Committee agreed not to take it. <br /> 14 <br /> Alternate Ed operable wa1l . Paul said cuts have been made in the rest <br /> of the school this program for 15 students should sac r i ice also. <br /> This program has 2 bathrooms at $10 , 000 each and 2 operable walls at <br /> 0 ,000 , cuts can be made without eliminating the program. <br /> The committee agreed to cut one bathroom and 1 operable wall for a $30, 000 <br /> savings . <br /> 2 <br /> 5a. Air Gond i t i on i n i n the remaining building . d said they should keep <br /> I ' b ra r auditorium tor"i um and administration i n i st ration area* what else i s there? <br /> �t �n the library , <br /> Interior classroom. They need more air changes but it does not have to be <br /> air conditioning. <br /> Me r r sue said the computer rooms w i 11 need air conditioning because of the <br /> Y <br /> high humidity. The library has 25 computersp <br /> 37 , Bob said these 50 floor receptacles assures we can give you a <br /> technically advanced school but it can ' t be done without the parts needed. <br /> ' <br /> 3 . carpet In classroom. Paul feels it is an important element, makes a big <br /> difference in sound . Ed agrees: <br /> Bill is concerned about the health problems associated with carpet. <br /> 3 will leave to the architects . <br /> Paul reviewed the specs and had some comments/suggestions : <br /> A. 4 boilers down to 2 - there will be a meeting with Paul and the <br /> engineers next week to discuss these issues . <br /> B. Main switch board could go to fuses * <br /> C , Master clock system - is it needed err due said it is . <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.