Laserfiche WebLink
Joel said even with this new schedule, it appears they are 2-6 weeks <br /> behind, depending on the activity. <br /> Stone explained they are presently heating derrick 1 and heat went on in <br /> derrick 6 today, and goes on it derrick 4 tomorrow. <br /> Joe asked if all steel shop drawing corrections have been made? <br /> Jim said they have not . Repairs are on going. <br /> Joe asked if it is causing coordination problems with mechanicals? <br /> Jim said is will eventually. The combination of weather, holidays , etc . <br /> has slowed things down. <br /> Paul asked Stone (Herb) where they stand on steel? <br /> Herb described the remaining repairs which need to be made , column bases <br /> that have to be drilled, anchor bolt problems . They plan to start door <br /> frame installation and can then move on to drywall . <br /> They will pour concrete on perimeter of derrick 7 and around column bases <br /> on 11 & 12 so they can finish the exterior walls . <br /> They have had a conflict with the survey company and are in the process of <br /> hiring a new surveying company. <br /> Their goal is to have all diamonds poured in 2 weeks . <br /> Roofs : goal is to finish all plates in roof this week. <br /> Paul asked when all exterior walls will be ready for studs and closure? <br /> Herb said the wood blocking person will start on Tuesday and will take <br /> about 2 days . They should be in good shape in 1 week. <br /> Paul said he still sees roof decking to be completed on derrick 11 . What is <br /> the bottom line on the steel being completed. <br /> Herb said 2-3 weeks . <br /> Paul said he is beyond frustrated . This steel problem doesn't seem to get <br /> any better. <br /> Paul asked when the exterior of the building, except for roof, will be <br /> closed? <br /> Herb said 2-3 weeks, by mid- January. He said they put in a tremendous <br /> effort this week to get the sheathing and plastic up. <br /> Paul said the schedule said the building will be closed by December 15 , it <br /> has already slipped by 4-5 weeks. He has a real problem with that . He is <br /> looking at key items and they aren't happening . <br /> Costa said the main focus has been enclosing the academic wing and getting <br /> it on line and then they will fall back on the auditorium and gym. <br /> Paul said this town bought a whole job - and that isn't happening . The <br /> amount of work done is very disappointing . <br /> Paul asked about the brick work. <br /> Herb said the main focus is to get derricks 1-6 enclosed. The mason will <br /> go 300 feet at a time . <br /> Paul said last week, while the mason moved the tarping , they had no <br /> production. <br /> Jim said the mason is catching up to the steel . <br /> Herb said it is a filed sub bidder. There was a question of who owned the <br /> heat which held things up. <br /> 2 <br />