My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/21/1995 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
3/21/1995 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2018 5:05:43 PM
Creation date
8/20/2018 1:06:06 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
03/21/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L <br /> Merry sue said they have to promise to take a hard look at the PP&E budget . <br /> Paul said the Committee is not going to extend the list of alternates, they <br /> are talking about adding back in those items from the alternates 1ist . <br /> Peter said the Selectmen don ' t have enough information to decide which <br /> alternates to put back in against the FF&E items. <br /> Joe said it is a share the technology has to be compromised . That is what <br /> the school needs . Attention should be paid to the technology budget. <br /> Peter suggested they ask Anne Shaw to run the projections on the tax rate <br /> for the additional 2 million , per $1 , 000, <br /> Bill said the committee assured town meeting they could deliver this school <br /> for $27 . 8 million. <br /> Paul disagrees. <br /> Motion: Merry Sue, Peter, Janice, Joe, Paul in favor. <br /> Steve, Bill against. <br /> Paul will meet with the Selectmen on Monday night,, <br /> sMMA RESPONSE TO PEER REVIEW COMMENT <br /> Tom wren spoke with their electrical/mechanical engineer doing the peer <br /> review. If they could stress only l thing i t would be the need for a <br /> speaker light for the fire alarm system in each classroom. <br /> Phil said they have already done that, with an addendum <br /> He said there i s no guarantee you will get the required decibel level i n <br /> the classroom from the corridor . They put a horn strobe in every <br /> classroom. <br /> (Peter 1oft the meeting , ) <br /> Phil said a 1 1 items from the peer review were respond to by sMMA ; as of <br /> 00 today they were still in typing . The Committee members should have it <br /> by Thursday . <br /> The filed sub bids are due April 6th . They have up to 48 hours before that <br /> for addendum. <br /> Phil said they printed 15 o sets of drawings and are out of them, <br /> Bi 1 1 asked Paul if Dodge reports had any updates on construction costs? <br /> Paul said they don ' t have the last 6 months figures. He did spew with <br /> Sarah Johnson who does an economic report for a local network. She said <br /> the numbers now are reflecting the contractors adding back in for overhead <br /> and profit which they hadn ' t done for the last 2 years . Materials are only <br /> up -5 and labor up maybe . The big number is the 1 overhead and <br /> profit , contractors now need profit to stay in business . You cannot <br /> predict competition . with that many drawings out, it is a good indication <br /> of the discount the p ro,"ect will receive but discount from what is the <br /> question . <br /> Phil said he met with the Building Inspector last Wednesday f ron 5-9 p .m. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.