My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/8/1995 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
8/8/1995 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2018 5:08:37 PM
Creation date
8/20/2018 1:34:18 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
08/08/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
steel . <br /> Paul agreed. The schedule is written to their detriment . <br /> There is a very aggressive Super on the job . He is doing the <br /> best he can. <br /> Joel said SMMA has been going over the schedule for the next 3 <br /> weeks , it is doable if everything falls in line . <br /> Paul explained the testing company said the floor finish is <br /> perfect . <br /> Joel explained the section where the forms were stripped early <br /> tested OK. No remedial testing is required. Their engineers ' <br /> opinion is that section of wall should be OK. <br /> Fields and Grounds : Lawrence Lynch started. working overtime last <br /> week and will be working Saturdays . <br /> Dan Solien visited the site and looked at the stockpiles of top <br /> soil and found the pile contained excessive amounts of debris - <br /> branches , roots , etc . <br /> Some of this material was already spread on the south field . Dan <br /> wrote a field inspection report which was passed onto Stone . The <br /> material needs to be screened , The method is tinder the <br /> contractors responsibility but the material has to be removed . <br /> There are two issues : <br /> - remove the material from the stockpile before any more is <br /> placed. <br /> - remedial action for the south field on what has already been <br /> placed. (About 1/3 of the field has been spread, 8" deep . ) <br /> Mr . Barthelmes met with Gerry Lynch today. They .will screen the <br /> rest of the loam. For the spread areas they will re-grub the <br /> area and clean it out , disking it a york raking it . They met for <br /> 2 hours discussing these issues . <br /> Paul asked why they waited so long before calling Dan Solien to <br /> look at it? <br /> Jim said he only heard on Friday they would start using it and he <br /> called Dan . <br /> Paul asked if this will cause delay? <br /> Mr . Barthelmes said Gerry Lynch said they can accomplish it <br /> without delay - they can meet the date . They plan to spread 800 <br /> yards per day. <br /> Tom said the date for spreading of loam for the football field <br /> has already passed. There is a lot of catching up to be done . <br /> Jim said L . Lynch seems to be the type of contractor who will do <br /> whatever it takes to meet their commitment . <br /> Mr . Barthelmes said after spreading of the loam, there will still <br /> be excess material on site , probably about 4 , 000 yards . The <br /> specifications are unclear as to what is to be done with it . L . <br /> Lynch feels it is his . <br /> Paul said there is a town bylaw that says loam belongs to the <br /> town. The fill is his . <br /> He suggested talking to Greg Taylor to see if there is any need <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.