Laserfiche WebLink
S_ <br /> 4 <br /> Paul said the first step is to find out if we funded training on a Saturday, would staff come` <br /> John things they would. John Williams and Dr. DeMoura need to decide what to do with the <br /> remaining staff. <br /> Merry Sue asked if what they need is a commitment form us to pay for additional training at <br /> $600 per session, for a total of about$2,400? <br /> Mike Kirwin said there is still that much in his training budget. <br /> Bill asked if it shouldn't be mandatory` <br /> Dr. DeMoura said if it is mandatory, it needs to be during the school day, and there is the added <br /> cost of substitutes. <br /> Paul said hopefully Mike Pietrowski can video tap all these sessions. <br /> Voice Mail: the voice mail training was scheduled but the person doing the training forgot and <br /> didn't to show up, it Will be re-scheduled. <br /> National Telecom needed something from Mashpee before they would provide the additional <br /> cables (discussed at an earlier meeting for Tv studio, nurses office, circulation desk), Mike <br /> I irwin brought a letter for Paul to sign to provide to National Telecom. <br /> Change Orders: were discussed by the Committee previously but CIC"s labor rate was <br /> unacceptable to CRC. The change order now needs approval for <br /> - ,8 10 for arch serve backup so al 14 serves cone to 1 backup. <br /> $10,484.25 for anti virus software, which will be on the network. <br /> -credit for auto cad software,because the technical lab was modified.. Something will be needed,, <br /> which will be dealt with in Phase IT but it will not be as expensive as autocad, <br /> Merry sue made a notion to approve the change order for$2,790 for additional <br /> Centrex lines for building maintenance office and library circulation desk(previously <br /> approved for not to exceed$2,800.) Janice seconded the motion. All members were <br /> in favor. <br /> BB ommunications' change order for a transcoder,which tales the video signal so it comes out <br /> as 3 separate signals,the Meyer requires it, for$3,155. A video patch panel, Worn from HB <br /> explained there were not enough in the original design to route the signal to all the places it <br /> needs to go. <br /> Paul asked if we didn't buy it what would happen? Toni said you couldn't do a key signal i.e. <br /> weather chart behind a person. It is a used production tool. Paul asked why it was left out" <br /> Tom said the bid specs were written around a camera that afforded RGP output but that camera <br /> was not selected. <br /> Merry Sue made a motion to approve the change order for CIC and <br /> Communication for the above described items. Janice seconded the notion. All <br /> members were in favor** <br /> FF & E EQUIPMENT <br /> 90%of the furniture and equipment bids that have been awarded is on site now and in its proper <br />