My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/11/2014 CONSERVATION COMMISSION Minutes
>
9/11/2014 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2018 5:08:55 PM
Creation date
11/26/2018 1:40:44 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
09/11/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6:12 The Mackin Group, Inc. 76 Triton Way. Request to Amended Certificate of <br /> Compliance DEF File No. SE 43-1214 and SE 43-1625. A COC. <br /> Th6 Agent suggested a continuance of this ,Application to allow Tow. Counsel time to <br /> review documents submitted by the-Applicant's attorney. with the Applicant"s consent,the <br /> Agent requested the Commissioners continue the hearing to October 9, 2014. <br /> Motion: Mr. Shaw made a motion to continue the hearing to October 9, 2014 at 6;12 <br /> .m., seconded by Mr; Sweet. vote unanimous -o. <br /> 6:15 James C. Atkins-and John J. Weltrnan, 80 Punkhorn Point Road. Proposed <br /> construction of a pool, spa, patio, elevated walkway, osprey platform, as well as enhance, <br /> restore and expand degraded buffer zone and replace turf. Applicant requests continuance <br /> to October 9, 2014 to allow time to submit revised plan showing coastal bank. NOL <br /> Motion; Mr. Sweet made a motion, at the Applicant's request,to continue the hearing <br /> until October 9,2014 at 6:15 p.m., seconded by Mr. Shaw. vote unanimous -o. <br /> 6:18 Cotuit Solar, LLC, 36 Savannas Path. Proposed renovation of existing structure <br /> into co=earcial space and construction of a warehouse along with utilities, storm water <br /> management, driveways and parking areas. Continued from August 28, 2014 to allow time <br /> to submit revised site plan. NOL <br /> Resource Area:. Buffer Zone Bordering Vegetated wetland, Intermittent Stream. <br /> Jack Vaccaro, Vaccaro Environmental Consulting, was present on behalf ofCotuit Solar, <br /> and stated Cotuit Solar is proposing to move its corporate offices to Mashpee at 3 6 Savannas <br /> Fath. He referred to Savannas Path as an `informal' road which extends north from <br /> Sans Mill just off Route 28. The proposal is to redevelop ars existing family residence <br /> and convert it into an office headquarters. A. barnstructure/warehouse will also be <br /> constructed on the property ert to store materials for the solar business. The site would not b <br /> accessed from Savannas Path but would be accessed by extending Trinity dace. Savannas <br /> Path would remain open but a gate would be installed to prevent through traffic. <br /> There-is a bordering vegetated wetland associated with Quaker Run. Quaker Run is ars <br /> intermittent stream so there is no additional riverfront extending from the river bank. A <br /> portion of the addition will extend out about 8 feet into a previously disturbed area and a <br /> small portion is within the 100' buffer zone. <br /> The area that will be developed for storm water management will be a vegetated swale that <br /> would receive rainwater from goofs, parking areas, etc. to promote infiltration o <br /> groundwater. DEP requires evidence that the proposal will not increase runoff on the.site. <br /> The Applicant must also demonstrate that o per cent of the total suspended solids that might <br /> be in the storm water runoff are captured. This design will include a combination of etch <br /> basins,bio retention and infiltration which will result in 98 per cent of total solid removal. <br /> 114x. Vaccaro stated there is no need to upgrade the septic system. The proposed parking <br /> spaces .satisfy the Town's requirements. Initially, access will be from Savannas Path until <br /> the construction of the access road is completed. Them may be no need to eliminate trees <br />
The URL can be used to link to this page
Your browser does not support the video tag.