My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/21/2014 DESIGN REVIEW COMMITTEE Minutes
>
10/21/2014 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2018 5:09:58 PM
Creation date
11/26/2018 2:30:54 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/21/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
89 Industrial Drive continued <br /> 'Lotion* Catherine Laurent motioned to.recommend approval-to Z A with comments made: <br /> Controlled construction. <br /> o Show 6' solid fence on Plan with recommendation for 5-6 inch space at bottom. <br /> 0 Supply separate detail drawings on the spray booth at time of permitting. <br /> Recycling dumpster needed. <br /> Do curbing at entrance. <br /> Solid concrete forebay for all storm water before It enters the swals. <br /> -o' setbacks. <br /> Unless they get letter and Z A approves, get rid of 10.parking spaces. <br /> Show sign on Plan. <br /> Glen Harrington seconded the motion as amended. .All Committee members approved., except Torr <br /> Fudala, who opposed. <br /> 8 Echo Load <br /> New 9,992 square foot building <br /> Representative Anne Serninara &-Lou Se inara <br /> Daniel Ojala (civil engineer and land surveyor), Lou Seminara, and Anne Seminara were present. Mr. <br /> jala'shoe ed the Site Plan. He said Town took the road and Applicant is paying the betterment off-, <br /> and cleaned up the site. it is an industrial site; building height is 2 '; not in Zone 2; building sprinkled; <br /> and Applicant will be leasing the building. <br /> 'Mr. Oiala pointed out substantial trees on the site Plan and sa.id-they will have landscape <br /> architect, if necessary show details. <br /> Handicap parking. <br /> Gate in front that neighbors recommended. Front gate okay with Police and Fire departments. <br /> Tom Fudala stated creed for:some solid, above-ground forebays. <br /> Glen Darrington stated that Board -of Health- eras agreeable to above-ground forebays before <br /> when they were doing gravel foreba s. Torn Fudala said if you can get it to work With catch <br /> basin it might be okay. Applicant will discuss with Planning Department and with Board of <br /> Health. <br /> Swale overflow–App licant gill re-scale if they hold grater...they said they can change to 6". <br /> Applicant will look.at this. <br /> • Glen Harrington said since the engineers'have switched in the middle of the proposal, he <br /> would repeat comments he made before—namely: that office apace to be sign under the <br /> design flog. They will do.this. <br /> Lou seminars said each unit plumbed for individual bathroom-2 handicap bathrooms, and <br /> roughing in 3 more bathrooms. <br /> No floor drains. hike Mendoza said Plumbing Code requires floor drain if there is an overhead <br /> door. Glen Harrington said if repairs done inside building then Plumbing Code sags you,h, <br /> to pint in floor drains-Board of Health doesn't like them but required by Plumbing Code, <br /> Applicant will speak with Plumbing -Inspector. <br /> Signage–Typical board sign. Mike Mendoza said they should have complete measur pnt <br /> from grade,to top. - <br /> • Lighting wall-mounted around outside; cast down; a light over each door. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.