My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/21/2014 DESIGN REVIEW COMMITTEE Minutes
>
10/21/2014 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2018 5:09:58 PM
Creation date
11/26/2018 2:30:54 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/21/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
58 Echo Roadlcontinue4j <br /> Jonathan Furbush said to be'sure all parking, including offices, is calculated. <br /> 0 Roof run-off--all piped and going with-parking run-off. <br /> eommi tee comments <br /> Plarrnin <br /> Storm water– meed some solid, above round concrete box foreba s to catch spills and <br /> sediments. Need operations and maintenance plans on storm water facilities to maintain and <br /> clean out. Town needs copy of the contract. Torn said this applies to both Site Plans. <br /> Applicant to discuss further with l lanning epartm nt and with hoard of Health. <br /> Warehouse/office space—different parking space requirements. TorFudala suggested they <br /> do some alternate calculations to see which one is higher and that gives more flexibility in the <br /> future. <br /> Buildin <br /> Controlled construction. <br /> Fenced-in storage area is not shorn on Ilan. Lou Serninara said storage mostly palletized <br /> like hydro-seeding/mulch/piping, etc. but he would like option to store boaVtruck. That storage <br /> option has to be researched. Mike Mendoza will research it and will report to Z A. <br /> Fire De artrnent <br /> t <br /> Gate to have Knox Box padlock or Knox Box itself. <br /> PW <br /> Echo is Torn Road so need to apply to DPW for curb cut permit. <br /> Recycling durnpter needed. <br /> Board of health <br /> Office space to be accounted for In the Title V flow. <br /> Each unit,to be plumbed to have a bathroom. <br /> No floor-drains.proposed .unless use.required -by the Plumbing code. <br /> Go to Board of health for separate approval. <br /> Motion: Catherine Laurent motioned to recommend approval of the Special Permit with special <br /> conditions: <br /> Solid forebay and maintenance contract for:the bio-retention area. <br /> 0 Knox Box,at outside gate. <br /> Controlled construction. <br /> e Curb cut required. <br /> 0 Recycling durpster rewired. <br /> 0 Office space to be accounted for in the Title V flow. <br /> Each unit to be plumbed to have a bathroom. <br /> No floor drains proposed unless use required by the Plumbing Code. <br /> Go to Board.of Health for separate approval at Board meeting. <br /> Tom F daia seconded the motion;:-and it was unanimously passed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.