Laserfiche WebLink
88 Echo Toad <br /> New 9,980 square foot building <br /> e resentative Anne Seminara & Lou Seminara <br /> Daniel Ojala civil engineer and land surveyor), Lou Seminara, and Anne Seminara were present. Mr. <br /> jala said this is a separate site and shred the.Site Plan. It is Town road; industrial-use; building <br /> height is 2o' to peak; not in Zone,2.; building sprinkled; and Applicant will be leasing the building. <br /> 32 employees-2 handicap.van spaces in front. Adequate parking. <br /> Fire truck access. <br /> Frear buffer-24-25'.-25.'. Meets all setbacks. <br /> Meets stornn water guideli es. <br /> Lou Seminara said from his experience he guesses leases to be fifty-fifty officeindustrial. Torn <br /> Fudala said they have to specify uses in their application. Use also impacts parking <br /> requirements. <br /> Mike Mendoza advised they contact Plumbing Inspector since they show overhead doors. <br /> Lou Seminara said he is thinking of going beige/green for building color. He said it's an <br /> k industrial building and will look nice. <br /> Glen Harrington cautioned Applicant.that proposed uses submitted to Z A-may not be <br /> approved.by Board of Health. <br /> 9 ,Jonathan Furbush said ZBA will need Landscape Flan to show all sides. <br /> Committee Comment <br /> Plann�n <br /> Tom Fudala pointed out that no vegetation in the 10' buffer to the Voest. Torn said need 19r <br /> vegetated buffer unless ZA approves. Catherine Laurent suggested Applicant should identify <br /> trees there that are worth saving and thea supplement. Applicant will do this. <br /> Board of Health <br /> Suggested to do denite system. <br /> Has to have Board of Health approval. <br /> Buildin <br /> • Controlled construction. <br /> • Discuss bay issues with Plumbing Inspector. <br /> • Sign details incomplete. <br /> Fire De arty ent <br /> • Fire hydrant locations to be shown on Plan. <br /> • To provide.Fire Department-with tu.ming radius-template they did on this Plan. <br /> • [Need fire lane on Pian. <br /> PW <br /> Durnpster to be fenced in and on a slab. <br /> e Recycling dumpster required. <br /> Need to apply to DPW for curb cut Permit. <br /> 6 <br />